Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 26 pages
Exam (elaborations)

Lean Six Sigma Green Belt Certification Examination Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

Document preview thumbnail
Preview 3 out of 26 pages

Lean Six Sigma Green Belt Certification Examination Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

Content preview

Lean Six Sigma Green Belt Certification
Examination Questions And Correct
Answers (Verified Answers) Plus
Rationales 2026 Q&A | Instant
Download Pdf
1. During which phase of the DMAIC methodology is a project charter
developed and approved? A) Measure B) Analyze C) Define D) Improve C)
Define Rationale: The project charter is the foundational document
created during the Define phase. It establishes the problem statement,
goal statement, project scope, team members, and timeline, securing
formal authorization from stakeholders and sponsors to proceed before
any data collection or analysis begins.
2. Which of the following tools is primarily used to identify and map all
stakeholders affected by a process improvement project? A) RACI Matrix B)
Fishbone Diagram C) FMEA D) Scatter Plot A) RACI Matrix Rationale: A RACI
matrix (Responsible, Accountable, Consulted, Informed) is highly effective
during the early stages of a project to clearly delineate stakeholder roles,
responsibilities, and involvement levels, ensuring smooth communication
and change management.
3. What does the "S" in a SIPOC diagram stand for? A) Standard B) Supplier C)
Specifications D) Scope B) Supplier Rationale: SIPOC stands for Suppliers,
Inputs, Process, Outputs, and Customers. It is a high-level process
mapping tool used in the Define phase to understand the boundaries and
components of a process from end to end.
4. A process has a specification limit of 50 +/- 5. The actual process mean is
50, and the standard deviation is 1.67. What is the approximate Cp value of

, this process? A) 0.50 B) 1.00 C) 1.33 D) 2.00 B) 1.00 Rationale: The process
capability index Cp is calculated as (Upper Specification Limit - Lower
Specification Limit) / (6 * standard deviation). Here, USL = 55, LSL = 45, so
the tolerance is 10. Dividing 10 by (6 * 1.67), which is approximately 10,
yields a Cp of 1.00.
5. Which type of waste (Muda) involves moving products or materials more
than necessary within a facility? A) Motion B) Transport C) Overprocessing
D) Inventory B) Transport Rationale: Transport refers explicitly to the
unnecessary movement of materials, parts, or finished goods between
processes or locations, whereas Motion refers specifically to the
unnecessary physical movement of workers or machinery.
6. What is the primary focus of the Lean methodology? A) Reducing process
variation B) Maximizing customer specifications C) Eliminating waste and
improving flow D) Lowering the cost of raw materials C) Eliminating waste
and improving flow Rationale: Lean centers on the systematic elimination
of non-value-added activities (waste) to maximize velocity and create
smooth, continuous flow through the value stream, whereas Six Sigma
primarily targets the reduction of variation.
7. In a normal distribution, approximately what percentage of data points fall
within +/- 2 standard deviations of the mean? A) 68.27% B) 95.45% C)
99.73% D) 99.99% B) 95.45% Rationale: According to the empirical rule for
a normal distribution, roughly 68% of the data falls within one standard
deviation, 95.45% falls within two standard deviations, and 99.73% falls
within three standard deviations of the process mean.
8. Which lean tool uses visual cues to signal when a process or station needs
more inventory or production capacity? A) Poka-Yoke B) Kanban C) Andon
D) Heijunka B) Kanban Rationale: Kanban is a pull-based visual scheduling
system that uses cards, bins, or digital signals to control production and
inventory flow, ensuring that upstream processes only produce items
when signaled by downstream consumption.

, 9. What type of data measures attributes or characteristics that can be
counted but not broken down into infinitely smaller increments? A)
Continuous Data B) Discrete Data C) Ratio Data D) Interval Data B) Discrete
Data Rationale: Discrete or attribute data consists of distinct, countable
values (such as the number of defects, pass/fail counts, or categories) that
cannot meaningfully be divided into fractional units, unlike continuous
data which can take any value along a scale.
10.A Six Sigma process allows for how many Defects Per Million Opportunities
(DPMO)? A) 2.7 B) 3.4 C) 4.5 D) 6.0 B) 3.4 Rationale: By definition, a Six
Sigma level of quality corresponds to 3.4 defects per million opportunities
when accounting for a historical and empirical 1.5-sigma shift in the
process mean over the long term.
11.Which tool is used during the Analyze phase to systematically explore the
underlying root causes of an event by asking sequential investigative
questions? A) 5 Whys B) Check Sheet C) Force Field Analysis D) Visual
Management A) 5 Whys Rationale: The 5 Whys technique is an iterative
interrogative method used to drill down through layers of symptoms to
find the true root cause of a defect or problem by repeatedly asking
"Why" an issue occurred until a systemic cause is uncovered.
12.What does a Value Stream Map (VSM) display that a standard cross-
functional deployment flowchart usually does not? A) Departmental
boundaries B) Material and information flow with cycle times C) The names
of process operators D) Project financial projections B) Material and
information flow with cycle times Rationale: A Value Stream Map
uniquely incorporates both the physical flow of materials and the
corresponding flow of information alongside key metrics like cycle time,
changeover time, and inventory levels to distinguish value-added from
non-value-added time.
13.Which of the following charts is most appropriate for monitoring the
number of defects per unit when the subgroup size varies? A) c chart B) u
chart C) p chart D) np chart B) u chart Rationale: The u chart tracks the

Document information

Uploaded on
June 29, 2026
Number of pages
26
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$23.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
masterystudyhub
5.0
(1)
Sold
21
Followers
1
Items
8018
Last sold
1 day ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions