●● Regulations for managing stormwater activity on a construction site
are outlined in the
Answer: NPDES
●● When should you read and understand your project stormwater
pollution prevention plan
Answer: Immediately after the project awarded and before you begin
any site work is
●● Which of the following is not an allowable stormwater discharge or
non-stormwater discharge
Answer: Discharges are contaminated groundwater
●● Construction activity may begin
Answer: When the jurisdiction of operation specifies you can start
●● Waters that sell anti-degration standards are placed on the _______
list
Answer: 303D
, ●● SWPP certifications are signed by
Answer: An officer of the project owner or an officer of the general
contractor.
●● TRUE OR FALSE: The document that must be completed signed
and submitted to the state to obtain authorization to discharge is the
NOT
Answer: False
●● The notice of termination can be filed when
Answer: All construction inside and outside of the building is completed
and the final stabilization has been verified as complete
●● Operators on a construction site are the entity in charge of plans and
specifications and the entity who is
Answer: Is in charge of daily activities
●● You should have a SWPPP for your construction site because (3
reasons)
Answer: 1. Its documents stormwater management
2. Demonstrates your intent to manage stormwater on your site
3. It is required by law