Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 19 pages
Exam (elaborations)

SWM DEQ BOARD EVALUATION 2026 QUESTIONS WITH SOLUTIONS GRADED A+

Document preview thumbnail
Preview 3 out of 19 pages

SWM DEQ BOARD EVALUATION 2026 QUESTIONS WITH SOLUTIONS GRADED A+

Content preview

SWM DEQ BOARD EVALUATION 2026
QUESTIONS WITH SOLUTIONS GRADED A+

●● VPDES Permit/Construction GP authorizes discharge of stormwater
from construction activities that are
Answer: greater than or equal to an acre


●● The Stormwater Management Act requires the State Water Control
Board to
Answer: permit, regulate, and control stormwater runoff


●● DEQ has ___ days to complete review of real or potential inter-
jurisdictional impacts upon request
Answer: 90


●● The Stormwater Management Act requires the following individuals
to obtain and maintain a certificate of competency
Answer: staff of a stormwater program, anyone contracted by a VSMP
authority, standard and specification holders


●● The dual certificate will expire three years from
Answer: the latest date of the certificates

,●● SWM plan must be approved by ___ before land disturbance
Answer: VSMP program authority


●● The water quality criteria sets a site-based load limit of ____ of total
phosphorus for new development
Answer: 0.41 lbs/acre/year


●● The phosphorus load limit uses the
Answer: 10% impervious cover


●● Part II B and II C water quantity criteria addresses
Answer: channel protection and flood protection


●● Which two plans in the SWPPP must be approved?
Answer: SWM plan, ESC plan


●● Does the SWM plan address runoff during or after construction?
Answer: post-construction


●● What is the lower limit of the range of imperviousness that can result
in stream degradation?
Answer: 10%

, ●● What do land disturbing activities consist of?
Answer: excavating, clearing, grading


●● LDA threshold for the SWM Act and Regulation
Answer: 1 acre or 2500 square feet for Chesapeake Bay Preservation Act


●● In situations where an initial exemption was applicable because
LDAs were related to emergency work, VSMP authority shall be advised
of the disturbance within
Answer: 7 days of commencing the LDA and shall submit a permit
application within 30 days of starting the land-disturbing activity


●● Localities with MS4
Answer: must adopt and administer a stormwater program


●● Localities without MS4
Answer: may choose to administer a VSMP or have DEQ administer the
program


●● DEQ is responsible for enforcing the ____ while locality ____ are
responsible for enforcing local ordinances
Answer: Construction GP, VSMP

Document information

Uploaded on
June 26, 2026
Number of pages
19
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeInsider
4.1
(9)
Sold
123
Followers
2
Items
46210
Last sold
1 day ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions