Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 76 pages
Exam (elaborations)

CESSWI PART 2 EXAM AND STUDY GUIDE NEWEST 2026 TEST BANK| COMPLETE 350 REAL EXAM QUESTIONS AND CORRECT VERIFIED ANSWERS/ ALREADY GRADED A+| CESSWI PART II EXAM REVIEW (MOST RECENT!!)

Document preview thumbnail
Preview 4 out of 76 pages

CESSWI PART 2 EXAM AND STUDY GUIDE NEWEST 2026 TEST BANK| COMPLETE 350 REAL EXAM QUESTIONS AND CORRECT VERIFIED ANSWERS/ ALREADY GRADED A+| CESSWI PART II EXAM REVIEW (MOST RECENT!!)

Content preview

1|Page


CESSWI PART 2 EXAM AND STUDY GUIDE NEWEST
2026 TEST BANK| COMPLETE 350 REAL EXAM
QUESTIONS AND CORRECT VERIFIED ANSWERS/
ALREADY GRADED A+| CESSWI PART II EXAM
REVIEW (MOST RECENT!!)


A storm drain inlet is protected with a gravel bag barrier. After a storm,
water is ponding several inches deep upstream of the inlet and beginning
to flood an adjacent travel lane. What should the inspector recommend
first?
A. Remove all inlet protection permanently
B. Modify or maintain the inlet protection to restore adequate drainage
while retaining sediment control
C. Ignore the ponding because sediment is being captured
D. Replace the inlet with a larger storm drain - Correct Answer - B
Inlet protection must balance sediment capture with safe drainage.
Excessive ponding that creates a hazard requires maintenance or
modification.


A newly graded 3:1 slope was hydroseeded two weeks ago. An
inspection reveals several rills forming on the slope, sparse germination,
and exposed soil throughout much of the area. Which BMP adjustment
is most appropriate?
A. Remove all seed and leave the slope bare
B. Install erosion control blankets and repair eroded areas
C. Add only additional fertilizer
D. Wait until vegetation reaches 100% cover - Correct Answer - B

,2|Page


Active erosion indicates that temporary stabilization is inadequate.
Erosion control blankets can provide immediate protection while
vegetation establishes.


A sediment basin designed for a large disturbed drainage area is nearly
half-filled with sediment. The outlet structure remains functional, but the
available storage volume has been significantly reduced. What is the
inspector’s best recommendation?
A. Leave the basin unchanged until it completely fills
B. Breach the basin and rely on downstream controls
C. Remove accumulated sediment to restore design capacity
D. Convert the basin into a permanent pond immediately - Correct
Answer - C
Sediment basins require periodic cleanout to maintain storage volume
and treatment effectiveness.


During a site inspection, workers are washing concrete equipment
directly onto bare soil near a drainage swale. No designated washout
area is present. What is the primary compliance concern?
A. Dust generation
B. Excessive vehicle traffic
C. Improper concrete washout and potential discharge of high-pH waste
D. Lack of fertilizer management - Correct Answer - C
Concrete washout water is highly alkaline and must be contained in a
designated washout area.

,3|Page


A large soil stockpile is located adjacent to a storm drain inlet. No
perimeter controls or cover are installed, and rain is forecast within 24
hours. Which action should be recommended immediately?
A. Move the inlet
B. Install perimeter sediment controls and cover or stabilize the stockpile
C. Wait until after the rain event
D. Add fertilizer to the stockpile - Correct Answer: B
Unprotected stockpiles near drainage features are a major sediment
source and should be controlled before rainfall.


Rock check dams have been installed in a temporary drainage swale.
The dams are spaced so far apart that water accelerates between them
and erodes the channel bed. What is the most appropriate corrective
action?
A. Remove all check dams
B. Increase spacing between dams
C. Reconfigure the check dams with proper spacing and elevation
control
D. Replace the swale with a pipe immediately - Correct Answer: C
Check dams must be spaced so the crest of the downstream dam is
approximately level with the toe of the upstream dam, reducing flow
velocity.


Strong winds are carrying dust from a large disturbed area across
adjacent properties and roadways. No dust-control measures are being
implemented. Which BMP category is most appropriate?
A. Dust suppression measures such as watering or soil stabilization
B. Inlet protection

, 4|Page


C. Sediment basin cleanout
D. Riprap outlet protection - Correct Answer - A
Dust control is a pollution-prevention measure commonly addressed
through watering, mulch, or other stabilization methods.


A storm sewer outfall discharges onto an unprotected slope. The
discharge area shows scour holes and exposed subsoil. What BMP is
most likely needed?
A. Additional fertilizer
B. Riprap or other outlet protection to dissipate energy
C. Removal of the storm sewer
D. More inlet protection upstream - Correct Answer - B
Scour at an outfall indicates excessive discharge energy that should be
dissipated with appropriate outlet protection.


During a routine inspection, you identify several BMP deficiencies. The
superintendent agrees to make repairs within 48 hours. What
documentation practice is most appropriate?
A. Document the deficiencies, required corrective actions, and expected
completion timeframe
B. Skip documentation because repairs are promised
C. Record only photographs without notes
D. Wait until the next inspection to document the issues - Correct
Answer - A
Inspection reports should clearly document observations, corrective
actions, responsible parties if applicable, and timelines.

Document information

Uploaded on
June 26, 2026
Number of pages
76
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$19.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ASSIGNMENT7
3.9
(170)
Sold
930
Followers
30
Items
3843
Last sold
17 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions