Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

Chapter 7 - ASTM C31/C31M - Making and curing concrete test specimens in the field Exam Questions and Answers with Verified Solutions | Latest Updated 2026

Document preview thumbnail
Preview 2 out of 6 pages

Chapter 7 - ASTM C31/C31M - Making and curing concrete test specimens in the field Exam Questions and Answers with Verified Solutions | Latest Updated 2026

Content preview

Chapter 7 - ASTM C31/C31M - Making
and curing concrete test specimens in
the field Exam Questions and Answers
with Verified Solutions | Latest Updated
2026



Practice C31/C31m gives Making, curing, protecting, and
standardized requirements for transporting
___, ___, ___, and ___, of test
specimens.


For cylinders with a diameter 16 +- 2mm (5/8 inch +- 1/16 inch)
of 150 mm (6 in.) or greater,
the tamping rod must be a
round, straight steel rod with a
diameter of ________.


The minimum frequency of an 150 Hz (9000 vibrations per minute)
internal vibrator used in this
procedure is _____.


The container for obtaining the Metal pan; Wheel Barrow; Flat,
concrete sample used in this Clean, nonabsorbent mixing board.
procedure can be a _____,
_____, or _____.


A 150 by 300 mm (6 by 12 in.) 2 Inch (50 MM)
cylinder mold can be used for
concrete containing aggregate
with particles not exceeding

, _______ in size, without the
need for wet sieving the
concrete.


The sample of concreted used C172/C127M
in molding test specimens
must be obtained in
accordance with what ASTM
Standard/Practice?


When strength specimens are Slump, air content, temperature.
to be made, what three other
test must be made?


After molding test specimens, False, the specimens must be
you should wait two hours moved immediately.
before moving them to the
location of initial storage. True
or False?


The supporting surface on 20 MM/M (1/4 in./ft)
which specimens are stored
shall be level within _____.


For concrete with a slump of Vibration
less than 25 mm (1 in.), the
test specimens must be
consolidated by _________.


If the concrete is to be Two
consolidated by vibration, a
standard 4 by 8 inch. [100 mm
by 200 mm] cylinder mold

Document information

Uploaded on
June 25, 2026
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$14.98

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
3
Followers
0
Items
8644
Last sold
1 week ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions