MANAGEMENT EXAM 2026 CERTIFICATION
ASSESSMENT BLUEPRINT VERIFIED
GOVERNANCE SYSTEM
◉ in
Answer: sourcing, in-house development-A common approach using
the professional expertise within an organization to develop and
maintain the organization's information technology systems
◉ outsourcing
Answer: It is an arrangement by which one organization provides
services for another organization that chooses not to perform them
in-house. Benefits include cost savings and extended work
resources. Drawbacks include a loss of corporate knowledge and
confidentiality.
◉ onshore outsourcing
Answer: The process of engaging another company within the same
country for services
◉ communication plan
, Answer: It defines the how, what, when, and who in the flow of
project information to stakeholders. It is key for managing
expectations.
◉ project constraint
Answer: A specific factor that can limit options within a project
◉ project assumption
Answer: A factor that is considered to be true, real, or certain
without proof or demonstration
◉ project deliverable
Answer: Any measurable, tangible, and verifiable outcome, result, or
item that is produced to complete a project or part of a project
◉ project objective
Answer: Quantifiable criteria that must be met for the project to be
considered a success
◉ project requirements
Answer: Defines the specification for product output of the project
document and is key for managing expectations, controlling scope,
and completing other planning efforts