What is the primary role of an Asbestos Management Planner
in Massachusetts?
A. Perform demolition work
B. Collect air samples only
C. Develop asbestos management and O&M plans based on
inspection data
D. Remove asbestos materials directly
Correct: The planner’s main responsibility is to interpret
inspection data and create asbestos Operations and
Maintenance (O&M) or management plans, not perform
abatement or sampling.
,2
Which regulation governs asbestos licensing in Massachusetts?
A. OSHA 1910.120
B. EPA TSCA Title II
C. MassDEP 310 CMR 7.00 and DLS licensing rules
D. NFPA 101
Correct: Massachusetts asbestos programs are governed by
MassDEP air regulations and Department of Labor Standards
licensing.
3
What is the first step in developing an asbestos management
plan?
A. Abatement scheduling
B. Review of asbestos inspection report and ACM
identification
C. Waste disposal planning
D. Air clearance testing
Correct: The planner must first evaluate inspection data
identifying ACM locations and conditions.
,4
What does ACM stand for?
A. Airborne Containment Material
B. Asbestos Certified Material
C. Asbestos-Containing Material
D. Approved Construction Material
Correct: ACM refers to any material containing more than 1%
asbestos by weight.
5
Which condition of ACM requires the most immediate action?
A. Good condition, non-friable
B. Intact and sealed
C. Damaged and friable
D. Painted and encapsulated
Correct: Friable and damaged ACM releases fibers easily and
poses the highest exposure risk.
6
What is the purpose of an O&M program?
A. Remove all asbestos immediately
B. Replace all building materials
, C. Manage asbestos safely in place during building use
D. Conduct demolition activities
Correct: O&M programs are designed to maintain ACM safely
without removal unless necessary.
7
Who typically uses the asbestos management plan?
A. Only demolition contractors
B. Building owners, maintenance staff, and contractors
C. Only regulators
D. Only laboratory technicians
Correct: The plan is a working document used by those
maintaining or working in the building.
8
Which agency enforces asbestos licensing in Massachusetts?
A. EPA only
B. OSHA only
C. Massachusetts Department of Labor Standards (DLS)
D. CDC
Correct: DLS handles asbestos contractor and professional
licensing in Massachusetts.
Planner License (MassDEP / DLS – LAA
system) Exam Questions With Correct
Answers (Verified Answers) Plus
Rationales 2026 Q&A | Instant
Download Pdf
1
What is the primary role of an Asbestos Management Planner
in Massachusetts?
A. Perform demolition work
B. Collect air samples only
C. Develop asbestos management and O&M plans based on
inspection data
D. Remove asbestos materials directly
Correct: The planner’s main responsibility is to interpret
inspection data and create asbestos Operations and
Maintenance (O&M) or management plans, not perform
abatement or sampling.
,2
Which regulation governs asbestos licensing in Massachusetts?
A. OSHA 1910.120
B. EPA TSCA Title II
C. MassDEP 310 CMR 7.00 and DLS licensing rules
D. NFPA 101
Correct: Massachusetts asbestos programs are governed by
MassDEP air regulations and Department of Labor Standards
licensing.
3
What is the first step in developing an asbestos management
plan?
A. Abatement scheduling
B. Review of asbestos inspection report and ACM
identification
C. Waste disposal planning
D. Air clearance testing
Correct: The planner must first evaluate inspection data
identifying ACM locations and conditions.
,4
What does ACM stand for?
A. Airborne Containment Material
B. Asbestos Certified Material
C. Asbestos-Containing Material
D. Approved Construction Material
Correct: ACM refers to any material containing more than 1%
asbestos by weight.
5
Which condition of ACM requires the most immediate action?
A. Good condition, non-friable
B. Intact and sealed
C. Damaged and friable
D. Painted and encapsulated
Correct: Friable and damaged ACM releases fibers easily and
poses the highest exposure risk.
6
What is the purpose of an O&M program?
A. Remove all asbestos immediately
B. Replace all building materials
, C. Manage asbestos safely in place during building use
D. Conduct demolition activities
Correct: O&M programs are designed to maintain ACM safely
without removal unless necessary.
7
Who typically uses the asbestos management plan?
A. Only demolition contractors
B. Building owners, maintenance staff, and contractors
C. Only regulators
D. Only laboratory technicians
Correct: The plan is a working document used by those
maintaining or working in the building.
8
Which agency enforces asbestos licensing in Massachusetts?
A. EPA only
B. OSHA only
C. Massachusetts Department of Labor Standards (DLS)
D. CDC
Correct: DLS handles asbestos contractor and professional
licensing in Massachusetts.