Exam (elaborations)

Erosion and Sediment Control Certification exam verified with correct answers 2026/2027 version

Document preview thumbnail
Preview 2 out of 15 pages

Erosion and Sediment Control Certification exam verified with correct answers 2026/2027 version

Content preview

Erosion and Sediment Control Certification exam verified with correct
answers 2026/2027 version
A local jurisdiction may have stricter requirements than the State for material
specifications.
a. true
b. false- answer>>>a. true

The minimum gauge wire for use in gabion baskets is:
a. 7
b. 12
c. 15
d. 11- answer>>>d. 11

The best way to prevent erosion is:
a. double up the silt fence
b. install a good working sediment trap
c. minimize the disturbed area and quickly re-establish vegetative cover
d. schedule construction when rain is not forecasted- answer>>>c. minimize the
disturbed area and quickly re-establish vegetative cover

Following initial soil disturbance or re-disturbance, permanent or temporary stabilization
must be completed within __________ calendar days for all perimeter dikes, swales,
ditches, perimeter slopes, and all slopes steeper than 3:1; and __________ calendar
days for all other disturbed or graded areas on the project site not under active grading.
a. 1, 2
b. 3, 7
c. 7, 14
d. 14, 21- answer>>>b. 3, 7

Adequate vegetative cover requires __________ percent ground cover.
a. 50
b. 80
c. 95
d. 100- answer>>>c. 95

An earth dike must be stabilized within 3 days of installation.
a. true
b. false- answer>>>a. true

A stabilized construction entrance:
a. is made up of Class I riprap or equivalent recycled concrete
b. uses nonwoven geotextile underneath the stone/recycled concrete
c. should slope toward the exterior of the site so runoff from SCE flows offsite

, d. none of the above- answer>>>b. uses nonwoven geotextile underneath the
stone/recycled concrete

Other than for a single-family home the minimum length of a stabilized construction
entrance is:
a. 25 feet
b. 30 feet
c. 50 feet
d. 60 feet- answer>>>c. 50 feet

The discharge from a SCE washrack should not be directed toward silt fence.
a. true
b. false- answer>>>a. true

Benching is required on a slope steeper than 2:1 if its height is greater than:
a. 20 feet
b. 30 feet
c. 45 feet
d. 50 feet- answer>>>a. 20 feet

The primary purpose of benching or serrated slopes is to:
a. provide additional area for landscaping
b. break up the surface flow of runoff on long steep slopes
c. provide a level area for wildlife crossing
d. none of the above- answer>>>b. break up the surface flow of runoff on long steep
slopes

Temporary stabilization is not required during the winter.
a. true
b. false- answer>>>b. false

Incremental stabilization should occur for every __________ feet of cut or fill.
a. 5
b. 15
c. 30
d. 35- answer>>>b. 15

Topsoiling is always required when permanently stabilizing an area.
a. true
b. false- answer>>>b. false

The following type of material is used in the installation of silt fence and super silt fence:
a. woven slit film
b. woven monofilament
c. nonwoven
d. none of the above- answer>>>a. woven slit film

Document information

Uploaded on
June 20, 2026
Number of pages
15
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$18.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ihuman
4.6
(85)
Sold
34
Followers
10
Items
572
Last sold
1 week ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions