Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 38 pages
Exam (elaborations)

Ohio Demolition Contractor Exam Practice Q&A

Document preview thumbnail
Preview 4 out of 38 pages

: Practice questions and correct answers for the Ohio demolition contractor license exam.

Content preview

Ohio Demolition Contractor Exam
Practice Questions And Correct Answers
(Verified Answers) Plus Rationales
2025|2026 Q&A | Instant Download Pdf



1. Which of the following is the first step before starting a demolition
project?
A. Begin removing walls immediately
B. Shut down nearby streets
C. Conduct a site survey and structural assessment
D. Remove all debris from site
Rationale: A site survey identifies structural stability, utilities,
hazardous materials, and potential risks before demolition starts.



2. Before demolition, which type of utility must be verified as
disconnected?
A. Telephone only

, B. Cable TV only
C. Electric, gas, water, and sewer
D. Air conditioning
Rationale: All utilities must be safely shut off to prevent explosions,
electrocution, or flooding.



3. OSHA requires a competent person to inspect the demolition site for
hazards:
A. Monthly
B. Daily
C. Weekly
D. Once per project
Rationale: Daily inspections ensure ongoing safety as site conditions
change during demolition.



4. What document is necessary to begin demolition in Ohio?
A. OSHA report
B. Demolition permit from the local authority
C. EPA emission summary
D. Contractor’s insurance policy
Rationale: Local building departments issue demolition permits after
verifying compliance with regulations.

,5. Which of the following is required when asbestos is present?
A. Regular dust suppression
B. Certified asbestos abatement prior to demolition
C. Continue work with respirators
D. Notify neighbors
Rationale: Federal and Ohio EPA laws mandate asbestos removal by
certified professionals before demolition.



6. What is the primary purpose of a demolition plan?
A. Estimate project costs
B. Outline safe methods and sequences of demolition
C. Determine disposal fees
D. Identify subcontractors
Rationale: The demolition plan ensures safety and efficiency by
detailing step-by-step procedures.



7. What PPE must be worn during mechanical demolition?
A. Hard hat, steel-toed boots, gloves, eye and ear protection
B. Safety vest only
C. Face mask and shorts
D. Regular clothing

, Rationale: Full protective gear is essential to protect workers from
falling debris and dust.



8. In Ohio, who enforces workplace safety during demolition?
A. State EPA
B. OSHA
C. Local building department
D. Department of Transportation
Rationale: OSHA governs worker safety standards for all demolition
operations.



9. What should be done before demolishing load-bearing walls?
A. Remove them immediately
B. Install temporary supports or shoring
C. Wet the area
D. Place caution tape
Rationale: Shoring maintains structural stability and prevents collapse.



10. Dust control during demolition is typically achieved by:
A. Water spraying or misting systems
B. Air blowers
C. Fans

Document information

Uploaded on
June 17, 2026
Number of pages
38
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$18.79

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
14
Followers
1
Items
1065
Last sold
2 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions