Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 12 pages
Exam (elaborations)

SC: CEPSCI- PRACTICE TEST Questions All Solved Correct Graded A+

Document preview thumbnail
Preview 2 out of 12 pages

Administered by the US environmental protection agency (EPA) Created the NPDES - Answer 1972 clean water act Amendment to CWA CALLED WATER QUALITY ACT - Answer 1987 South Carolina is NPDES delegated state. - Answer NPDES in south carolina SCDHEC - Answer NPDES regulations are administered by stormwater discharges from construction sites - Answer CGP authorizes land disturbing activities greater than or equal to 1 acre -land disturbance less than 1 ac within 1/2 miles of water body in SC costal zone - Answer Who must obtain NPDES coverage operator-person or company for a particular discharge - Answer NPDES permits are issued to -has day to day operational control to ensure compliance with SWPP -typically the owner or developer - Answer primary permittee submit NOI, Preparation of the C_SWPPP - Answer primary permittee responsibilities individual lot owner or residential builder that conducts land disturbing activity limited to an individual lot or group of lots as part of approved LCP of development - Answer Secondary permittee must on Contractor Certification- D-0437 - Answer contractors SCDHEC CGP, NOI, NPDES coverage approval letter, Contractor Certifications, Local Approvals, USACE approvals, Critical area permit(coast) - Answer On-Site SWPPP

Content preview

SC: CEPSCI- PRACTICE TEST
Questions All Solved Correct Graded
A+
Administered by the US environmental protection agency (EPA) Created the NPDES - Answer
1972 clean water act



Amendment to CWA CALLED WATER QUALITY ACT - Answer 1987



South Carolina is NPDES delegated state. - Answer NPDES in south carolina



SCDHEC - Answer NPDES regulations are administered by



stormwater discharges from construction sites - Answer CGP authorizes



land disturbing activities greater than or equal to 1 acre

-land disturbance less than 1 ac within 1/2 miles of water body in SC costal zone - Answer
Who must obtain NPDES coverage



operator-person or company for a particular discharge - Answer NPDES permits are issued to



-has day to day operational control to ensure compliance with SWPP

-typically the owner or developer - Answer primary permittee



submit NOI, Preparation of the C_SWPPP - Answer primary permittee responsibilites



individual lot owner or residential builder that conducts land disturbing activity limited to an
individual lot or group of lots as part of approved LCP of development - Answer Secondary
permittee



must on Contractor Certification- D-0437 - Answer contractors



SCDHEC CGP, NOI, NPDES coverage approval letter, Contractor Certifications, Local Approvals,
USACE approvals, Critical area permit(coast) - Answer On-Site SWPPP

, a copy of signed and certified SWPPP, NOI, and CGP coverage letter from DHEC must be retained
at site or electronically accessible - Answer OS_SWPPP



minor modifications made directly in the field,do not need approval by DHEC- additional BMP's,
removal of disturbed areas - Answer minor modification to ON-SWPPP



must be made by qualified individual and submitted to DHEC or appropriate delegated entity for
approval - Answer major modifications to OS-SWPPP



include a phased stormwater management plan which identifies all BMP's and grading work
conducted during a specific portion of the sites construction sequence. Each phase identified on
at least one separate plan sheet. - Answer Phased plan requirement > 5



at least two separate plan phases are required - initial land disturbance phase - stabilization
phase - Answer Phased plan requirement < 10 but > 5 acres



at least 3 separate plan phases are required - initial land disturbance phase - construction phase
- stabilization phase - Answer Phased plan requirement ≥ 10 acres



1. areas of site disturbed by construction activity and areas used for storage of materials
exposed to precipitation

2. stormwater conveyance systems for evidence of sediment

3. BMP's identified in OS-SWPPP

4. Discharge location to investigate if sediment leaving site, or if such locations are inaccessible,
nearby downstream location if possible.

5. Where vehicles enter or exit site for evidence of off-site sediment tracking. - Answer All
compliance inspection must include invesg. of, at a minimum of 5 of the following



at least once a week or within 24 hours of end of storm event >0.5 inches - Answer
inspection frequency after construction begins



Once every month - Answer Inspection frequency for sites that have reached temporary
stablization



linear activites may limit access to disturbed areas, in such cases representative inspections may
be performed - Answer Linear site inspection



personnel must investigate BMP's along the site for 0.25 miles above and below each access
point where the site intersects with -roadway - undisturbed right of way - other similar feature-

Document information

Uploaded on
June 15, 2026
Number of pages
12
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.89

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TestSolver9
3.5
(165)
Sold
955
Followers
127
Items
30581
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions