Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Lean Final Exam Questions and Answers – Study Material for Success

Rating
-
Sold
-
Pages
17
Grade
A+
Uploaded on
15-06-2026
Written in
2025/2026

Lean Final Exam Questions and Answers – Study Material for Success

Institution
Lean
Course
Lean

Content preview

Lean Final Exam Questions and Answers – Study Material for Success


Low Volume Lean Methodology - ANS ✔✔Start small, keep the scope doable, proceed in small
steps.



Low Volume Lean #1 - ANS ✔✔Manage Visually - start with the right metrics (that the manager
has control over); metrics for quality, productivity, customer service, inventory, safety; good
visuals - clear accountability, easily understood, kept up to date, evidence of regular review;
poor - unclear, info overload, influence on performance unknown, no action, no owner



Low Volume Lean #2 - ANS ✔✔Standardized Work for Managers - managers need audit
schedules; cannot change behavior unless managers change their methods



Low Volume Lean #3 - ANS ✔✔Associating a time with all work - estimating sheets; having
operators track their standard work by process or product type (not products)



Low Volume Lean #4 - ANS ✔✔Utilizing Day by Hour and FIFO Boards - Day-by-hour board: for
shared processes where there is not a reliable forecast (whiteboards, scheduling box); FIFO
boards - work orders route through various processes



Low Volume Lean #5 - ANS ✔✔Making Improvements when short of capacity - Single-Minute
Exchange of Die (SMED), bottleneck analysis, measure Overall Equipment Effectiveness (OEE),
standardized work (different than high volume), dedicated material handlers, outsourcing (make
vs. buy, capacity relief)



Low Volume Lean #6 - ANS ✔✔Making improvements when you have excess capacity - cross
training, insourcing, flexible machinery

,Low Volume Lean #7 - ANS ✔✔Value stream mapping - (new icon - shared process box), future
state steps - pull where you can, split delivery dates for large orders, setup reduction



Low Volume Lean #8 - ANS ✔✔Becoming aware of your inventory and using pull systems - use
different methods for "runners, repeaters, and strangers" (pull for higher volumes, MRP for
lower volume repeaters and strangers); determining kanban quantities, kanban boards to make
inventory more visual; use mix of push and pull and find the right boundary point



Low Volume Lean Other - ANS ✔✔Making manpower improvements (5S, std work, jidoka),
Improving machine performance and plant layout, office dept kaizen, office process kaizen,
improving product costing



Ideal State of Lean - ANS ✔✔One piece flow



If one piece flow isn't possible... - ANS ✔✔...produce parts just in time using a pull system



What are kanbans? - ANS ✔✔Signaling mechanisms used in pull systems



What is Just In Time? - ANS ✔✔Making and delivering the right material at the right time in the
right quantity



3 elements of Just In Time - ANS ✔✔Takt - making and delivering at the same rate the customer
is consuming

Flow - focusing on keeping the material moving through the value stream

Pull system - making in response to customer demand



Levels of instruction with withdrawing - ANS ✔✔1) Batch - mass production - common starting
point

2) Lot by lot - general purpose equipment like stamping, molding (long setups)

, 3) Kanban container by kanban container - smaller lot sizes

4) Single piece flow (ideal)



Pull - ANS ✔✔Production is initiated by customer (downstream) telling the producer (upstream)
to produce more.

No signal, no production.



Replenishment - ANS ✔✔Customer has consumed product and need to be replenished. Signal is
sent.



Kanban - ANS ✔✔A visual signal requiring...

1) item (description, number)

2) quantity

3) from location

4) to location



Two types of kanban - ANS ✔✔Withdrawal - taking some from the supermarket. Cards for
internal, electronic for external suppliers.

Production - need more, so make more. One card per container.



Pull system - ANS ✔✔1) Customer requests finished good.

2) Release withdrawal kanban to finished goods supermarket.

3) Product removed, withdrawal kanban attached to product.

4) Production kanban taken off product and placed on kanban post.

5) Material handler collects production kanban and delivers to production area.

6) Product made and production card attached.

7) Product in supermarket

Written for

Institution
Lean
Course
Lean

Document information

Uploaded on
June 15, 2026
Number of pages
17
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$22.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BravelRadon Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
944
Member since
4 year
Number of followers
540
Documents
51113
Last sold
4 days ago
EXAM HUB

Welcome to Exam Hub Are you looking for high-quality, exam-ready notes, past papers, Test Banks, and well-researched study materials to boost your grades? You’re in the right place! I create and upload detailed, easy-to-understand, and well-structured documents across multiple subjects. All my materials are designed to help you study , save time, and excel in your coursework and exams! On this page NURSING EXAMS,STUDY GUIDES,TESTBANKS AND QUALITY EXAMS IS THE KEY TO STUDENTS CAREER EXCELLENCE, you find all documents, package deals, and flashcards offered by BravelRadon (EXAM HUB STORES!)....kindly recommend a friend for A+ GARANTEEd either you are a first-year student or final-year graduation! best of luck!

Read more Read less
3.5

161 reviews

5
59
4
30
3
33
2
8
1
31

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions