ICC Masonry Exam Questions With Correct
Answers
Which of the following is the standard specification for loadbearing
| | | | | | | | | |
concrete masonry units? - CORRECT ANSWER✔✔-ASTM C 90; RCMCI
| | | | | | | | |
6th Edition, Section 2.2.1
| | |
Which of the following grout admixtures is used to obtain a high
| | | | | | | | | | | |
slump with reduced water? - CORRECT ANSWER✔✔-Super plasticizer;
| | | | | | | |
RCMCI 6th Edition, Section 2.11.6
| | | |
Which of the following is the standard specification that autoclaved
| | | | | | | | | |
aerated concrete masonry units must conform to for the strength class
| | | | | | | | | | |
specified in the contract documents? - CORRECT ANSWER✔✔-ASTM C
| | | | | | | | |
1386; CI 530; Part 2, Section 2.3E. IBC
| | | | | | | |
2103.3
Grout intended for use in the construction of engineered and
| | | | | | | | | |
empirically designed masonry structures must comply with - CORRECT
| | | | | | | | |
ANSWER✔✔-ASTM C 476; 2006 IBC 2103.12 | | | | |
, The slump test for grout must be performed in accordance with -
| | | | | | | | | | | |
CORRECT ANSWER✔✔-ASTM C 1019; ASTM - C1019-03
| | | | | |
In what condition are grout specimens to be tested? - CORRECT
| | | | | | | | | | |
ANSWER✔✔-Damp; ASTM - 1019-03 | | |
When the prism test method is being utilized, how long must the
| | | | | | | | | | | |
prisms cure prior to being cut? - CORRECT ANSWER✔✔-28; 2006 IBC
| | | | | | | | | | |
2105.3.1
After construction and grouting, masonry test prisms should not be
| | | | | | | | | |
disturbed or moved for a minimum of - CORRECT ANSWER✔✔-48
| | | | | | | | | |
hours; ASTM - C 1314, Section 5.10
| | | | | |
When field sampling grout, the elapsed time between obtaining the
| | | | | | | | | |
first and final portions of the sample shall not be more than - CORRECT
| | | | | | | | | | | | | |
ANSWER✔✔-15 minutes; ASTM - C1019, Section 7.2.1 | | | | | |
If mortar compression tests are required, how many tests per day are to
| | | | | | | | | | | | |
be taken for the three successive work days at the start of the job? -
| | | | | | | | | | | | | | |
CORRECT ANSWER✔✔-1; RCMCI 6th Edition, 3.2.4
| | | | |
Answers
Which of the following is the standard specification for loadbearing
| | | | | | | | | |
concrete masonry units? - CORRECT ANSWER✔✔-ASTM C 90; RCMCI
| | | | | | | | |
6th Edition, Section 2.2.1
| | |
Which of the following grout admixtures is used to obtain a high
| | | | | | | | | | | |
slump with reduced water? - CORRECT ANSWER✔✔-Super plasticizer;
| | | | | | | |
RCMCI 6th Edition, Section 2.11.6
| | | |
Which of the following is the standard specification that autoclaved
| | | | | | | | | |
aerated concrete masonry units must conform to for the strength class
| | | | | | | | | | |
specified in the contract documents? - CORRECT ANSWER✔✔-ASTM C
| | | | | | | | |
1386; CI 530; Part 2, Section 2.3E. IBC
| | | | | | | |
2103.3
Grout intended for use in the construction of engineered and
| | | | | | | | | |
empirically designed masonry structures must comply with - CORRECT
| | | | | | | | |
ANSWER✔✔-ASTM C 476; 2006 IBC 2103.12 | | | | |
, The slump test for grout must be performed in accordance with -
| | | | | | | | | | | |
CORRECT ANSWER✔✔-ASTM C 1019; ASTM - C1019-03
| | | | | |
In what condition are grout specimens to be tested? - CORRECT
| | | | | | | | | | |
ANSWER✔✔-Damp; ASTM - 1019-03 | | |
When the prism test method is being utilized, how long must the
| | | | | | | | | | | |
prisms cure prior to being cut? - CORRECT ANSWER✔✔-28; 2006 IBC
| | | | | | | | | | |
2105.3.1
After construction and grouting, masonry test prisms should not be
| | | | | | | | | |
disturbed or moved for a minimum of - CORRECT ANSWER✔✔-48
| | | | | | | | | |
hours; ASTM - C 1314, Section 5.10
| | | | | |
When field sampling grout, the elapsed time between obtaining the
| | | | | | | | | |
first and final portions of the sample shall not be more than - CORRECT
| | | | | | | | | | | | | |
ANSWER✔✔-15 minutes; ASTM - C1019, Section 7.2.1 | | | | | |
If mortar compression tests are required, how many tests per day are to
| | | | | | | | | | | | |
be taken for the three successive work days at the start of the job? -
| | | | | | | | | | | | | | |
CORRECT ANSWER✔✔-1; RCMCI 6th Edition, 3.2.4
| | | | |