ICC Service Technician Study Guide
Questions & Answers
According to CCR, Title 23 UST Regulations, What is the frequency that
| | | | | | | | | | | |
the Monitor Certification must be performed? - CORRECT ANSWER✔✔-
| | | | | | | |
Every 12 Months | |
If visual monitoring is utilized as the means of release detection for
| | | | | | | | | | | |
single walled tank, it must be conducted on a _______ Basis. - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-Daily
The Purpose of spill and overfill protection equipment is to minimize the
| | | | | | | | | | |
potential for a release during: - CORRECT ANSWER✔✔-Fuel Deliveries
| | | | | | | | |
Which of the following is a potential symptom of toxic petroleum
| | | | | | | | | | |
exposure: - CORRECT ANSWER✔✔-Dizziness | | |
Tremors
Eye irritation
|
All of the above(correct)
| | |
Under-Dispenser Containment is required for ______ underground | | | | | | |
storage tank systems - CORRECT ANSWER✔✔-All
| | | | |
,All of the following are true for Automatic Tank Gauging (ATG) except
| | | | | | | | | | | |
for: - CORRECT ANSWER✔✔-ATG system are required to be installed in
| | | | | | | | | | |
all UST system
| |
According to CCR Title 23, UST regulations Spill containment (spill
| | | | | | | | | |
bucket) must meet all of the following requirements except: - CORRECT
| | | | | | | | | | |
ANSWER✔✔-Be installed on vent risers | | | |
Suction piping may not require leak detection if it has one check valve
| | | | | | | | | | | | |
located where? - CORRECT ANSWER✔✔-Directly below the suction
| | | | | | | |
pump
Service Technician performing work on Monitoring equipment must be
| | | | | | | | |
trained and certified by __________ - CORRECT ANSWER✔✔-The
| | | | | | | |
manufacture of the equipment. | | |
Air monitoring must be conducted ________ when performing work
| | | | | | | | |
within a confined space. - CORRECT ANSWER✔✔-Prior to and during
| | | | | | | | |
A UST Service Technician must be recertified by the equipment
| | | | | | | | | |
Manufacture at the time interval recommended by the equipment
| | | | | | | | |
manufacture or at least every ____ months, whichever is greater. -
| | | | | | | | | | |
CORRECT ANSWER✔✔-36 Months | |
, When an automatic tank gauge is utilized for single-walled tank leak
| | | | | | | | | | |
detection, it shall test the tank at least monthly after product delivery or
| | | | | | | | | | | |
|when the tank is filled to within _____ percent of the highest operating
| | | | | | | | | | | | |
level during the previous month. - CORRECT ANSWER✔✔-10
| | | | | | |
The following is true of spill buckets except: - CORRECT ANSWER✔✔-
| | | | | | | | | |
Must provide drainage for spilled product into the secondary
| | | | | | | | |
containment sump. |
If during an inspection of dispensing equipment at a retail gas station
| | | | | | | | | | | |
you find that the product is dispensing at a significant lower rate than
| | | | | | | | | | | | |
usual. You should check: - CORRECT ANSWER✔✔-For piping leaks.
| | | | | | | |
According to CCR title 23, UST Regulations the local agency must be
| | | | | | | | | | | |
notified by the Owner/Operator how long before conducting Secondary
| | | | | | | | |
Containment Testing? - CORRECT ANSWER✔✔-At least 48 hours before | | | | | | | | |
the test.
|
Poppet Valves are a Vapor Recovery Component installed: - CORRECT
| | | | | | | | | |
ANSWER✔✔-on the vapor recovery riser | | | |
If equipped with an ATG it shall be programmed to test the tank
| | | | | | | | | | | | |
_______? - CORRECT ANSWER✔✔-at least monthly| | | | |
Questions & Answers
According to CCR, Title 23 UST Regulations, What is the frequency that
| | | | | | | | | | | |
the Monitor Certification must be performed? - CORRECT ANSWER✔✔-
| | | | | | | |
Every 12 Months | |
If visual monitoring is utilized as the means of release detection for
| | | | | | | | | | | |
single walled tank, it must be conducted on a _______ Basis. - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-Daily
The Purpose of spill and overfill protection equipment is to minimize the
| | | | | | | | | | |
potential for a release during: - CORRECT ANSWER✔✔-Fuel Deliveries
| | | | | | | | |
Which of the following is a potential symptom of toxic petroleum
| | | | | | | | | | |
exposure: - CORRECT ANSWER✔✔-Dizziness | | |
Tremors
Eye irritation
|
All of the above(correct)
| | |
Under-Dispenser Containment is required for ______ underground | | | | | | |
storage tank systems - CORRECT ANSWER✔✔-All
| | | | |
,All of the following are true for Automatic Tank Gauging (ATG) except
| | | | | | | | | | | |
for: - CORRECT ANSWER✔✔-ATG system are required to be installed in
| | | | | | | | | | |
all UST system
| |
According to CCR Title 23, UST regulations Spill containment (spill
| | | | | | | | | |
bucket) must meet all of the following requirements except: - CORRECT
| | | | | | | | | | |
ANSWER✔✔-Be installed on vent risers | | | |
Suction piping may not require leak detection if it has one check valve
| | | | | | | | | | | | |
located where? - CORRECT ANSWER✔✔-Directly below the suction
| | | | | | | |
pump
Service Technician performing work on Monitoring equipment must be
| | | | | | | | |
trained and certified by __________ - CORRECT ANSWER✔✔-The
| | | | | | | |
manufacture of the equipment. | | |
Air monitoring must be conducted ________ when performing work
| | | | | | | | |
within a confined space. - CORRECT ANSWER✔✔-Prior to and during
| | | | | | | | |
A UST Service Technician must be recertified by the equipment
| | | | | | | | | |
Manufacture at the time interval recommended by the equipment
| | | | | | | | |
manufacture or at least every ____ months, whichever is greater. -
| | | | | | | | | | |
CORRECT ANSWER✔✔-36 Months | |
, When an automatic tank gauge is utilized for single-walled tank leak
| | | | | | | | | | |
detection, it shall test the tank at least monthly after product delivery or
| | | | | | | | | | | |
|when the tank is filled to within _____ percent of the highest operating
| | | | | | | | | | | | |
level during the previous month. - CORRECT ANSWER✔✔-10
| | | | | | |
The following is true of spill buckets except: - CORRECT ANSWER✔✔-
| | | | | | | | | |
Must provide drainage for spilled product into the secondary
| | | | | | | | |
containment sump. |
If during an inspection of dispensing equipment at a retail gas station
| | | | | | | | | | | |
you find that the product is dispensing at a significant lower rate than
| | | | | | | | | | | | |
usual. You should check: - CORRECT ANSWER✔✔-For piping leaks.
| | | | | | | |
According to CCR title 23, UST Regulations the local agency must be
| | | | | | | | | | | |
notified by the Owner/Operator how long before conducting Secondary
| | | | | | | | |
Containment Testing? - CORRECT ANSWER✔✔-At least 48 hours before | | | | | | | | |
the test.
|
Poppet Valves are a Vapor Recovery Component installed: - CORRECT
| | | | | | | | | |
ANSWER✔✔-on the vapor recovery riser | | | |
If equipped with an ATG it shall be programmed to test the tank
| | | | | | | | | | | | |
_______? - CORRECT ANSWER✔✔-at least monthly| | | | |