Terms in this set (84)
,inspection dept performs the 1. footing
following inspections: 2. under slab
3. foundation/ wood framing
4. rough-in
5. building framing
6. insulation
7. fire protection
8. final
exceptions to design professional 1. family residence up to 8 attached units
seal requirement 2. a building used by a farmer (unless it
involves the health or safety of the public)
3. an institutional or commercial bldg less
than $90,000 or exceed 2500 sq ft.
4. reno which doesn't alter structural system,
egress, or live/ dead load.
, Name the parts of a reference
stake
the distance shown on a the horizontal measurement of the distance
reference stake is... from the hub to center line of the end of the
fill. Also called the "offset"
Slope= Rise divided by Run