Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 19 pages
Exam (elaborations)

LADOTD Highway Plan Reading I Questions and Answers 2026–2027 | Construction and Transportation Program | Comprehensive Highway Plan Interpretation Exam Review with Rationales | A+ Grade

Document preview thumbnail
Preview 3 out of 19 pages

This document contains a comprehensive collection of LADOTD Highway Plan Reading I questions and answers designed to support candidates preparing for transportation and highway construction examinations. The content focuses on interpreting highway plans, reading construction drawings, understanding symbols and specifications, surveying basics, road design elements, elevations, grading, and Louisiana Department of Transportation and Development (LADOTD) standards.

Content preview

LADOTD Highway Plan Reading I questions and
answers 2026\2027 A+ Grade


Written agreement
- correct answer 1-1a: The CONTRACT covering the construction project is a(n) _____ between LADOTD
and the contractor.



Invitation to Bid
- correct answer 1-1b: Which document asks the contractor to submit a cost bid for a project?



Plans
- correct answer 1-1c: Contractors base their bid on the materials and labor necessary to construct the
highway project. Which document tells the contractor WHAT to construct and WHERE to construct it?



Standard, Supplemental, Special
- correct answer 1-1d: List the three categories regarding specs for a project



Proposal
- correct answer 1-1e: After the contractor completes an estimate, they fill out and submit a _____



Notice to Proceed
- correct answer 1-1f: The Dept issues a(n) _____ allowing the contractor to start a project.



Plan Changes/Special Agreements
- correct answer 1-1g: What can change the contract after the start of the project?



Plans
- correct answer 1-1h: Which documents are the most referenced when used to inspect; what, where,
and how the contractor builds?

,Change Orders
- correct answer 1-1i: Record the name of the document the project engineer prepares when a change
in plans is required.



Change order
- correct answer Occasionally, a contractor must preform extra work, to complete the project. Prior to
the contractor performing the work, the Chief Engineer signs a _______.



Special Provisions
- correct answer 1-2a: Which specs apply to only a specific project under contract?



Standard Specs
- correct answer 1-2b: What specs apply to all projects?



Special Specs
- correct answer 1-2c: Special directions applicable to specific projects are _____.



Supplemental Specs
- correct answer 1-2d: A revision or amendment to the Standard Specs is a ______.



1. Special, 2. Plans, 3. Supplemental, 4.Standard
- correct answer 1-3a (1-4): List the PROCEDURAL ORDER TO FOLLOW with regard to the clarification of
possible contract discrepancies.



Interpret
- correct answer 1-4a: To read a set of plans it is important to accurately _____ and understand what is
meant by each drawing an notation.



What and Where
- correct answer 1-4b: The plans indicate ____ to build and _____ to build a project.

, Relate
- correct answer 1-4c: Sheets within a set of plans _____ to each other. Info pertaining to a particular
feature of the project often appears on more than one sheet.



Clean and in order
- correct answer 1-4d:It is very important to keep a plan set _____ and in _____.



Federal, State
- correct answer 2-2a. There are two types of project numbers used to identify a project. (DRAIN CANAL
BRIDGES ON US HWY 90)



State Project #, Federal Project #, Project Name
- correct answer 2-4a. List the three things on the Title Sheet that identify a project. (DRAIN CANAL
BRIDGES ON US HWY 90)



Project Caption, Title Block, Layout Map
- correct answer 2-6a. List three places on the Title Sheet that indicate the State Project Number. (DRAIN
CANAL BRIDGES ON US HWY 90)



Federal-funding categories
- correct answer 2-8. Prefix Acronyms such as STP, I, BR, etc are ______.



Surface Transportation Program
- correct answer STP



Interstate
- correct answer I



Bridge Replacement
- correct answer BR



Interstate Maintenance
- correct answer IM

Document information

Uploaded on
June 11, 2026
Number of pages
19
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$33.09

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LECPOPC
4.1
(9)
Sold
61
Followers
4
Items
5717
Last sold
6 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions