Exam Questions with Correct Answers
(Verified Answers) Plus Rationales 2026
Q&A | Instant Download Pdf
1. What is the primary purpose of a photovoltaic disconnect?
A. Isolate electrical equipment safely
B. Increase module output
C. Improve shading tolerance
D. Increase battery capacity
Answer: A
Rationale: Disconnects allow safe maintenance and emergency operations.
2. Which condition may indicate a failed PV module?
A. Significant deviation from expected electrical performance
B. Proper voltage readings
C. Normal production levels
D. Clean module surfaces
Answer: A
Rationale: Reduced performance often indicates module defects.
3. What is the most important reason for performing commissioning tests?
A. Verify proper installation and operation
B. Increase warranty periods
C. Reduce documentation
D. Increase utility rates
Answer: A
Rationale: Commissioning confirms system functionality and compliance.
,4. A site survey reveals roof sections facing east, west, and south. Which
orientation generally provides the highest annual production in Florida?
A. South-facing orientation
B. North-facing orientation
C. East-facing orientation only
D. West-facing orientation only
Answer: A
Rationale: South-facing arrays generally maximize annual solar production.
5. What is the primary purpose of production monitoring systems?
A. Track performance and identify abnormalities
B. Increase inverter capacity
C. Reduce conductor sizes
D. Eliminate inspections
Answer: A
Rationale: Monitoring helps identify operational issues.
6. Which weather condition can temporarily increase PV output above standard
test condition expectations?
A. Cool temperatures with strong sunlight
B. Heavy shading
C. Dense cloud cover
D. Continuous rainfall
Answer: A
Rationale: Cooler module temperatures improve electrical efficiency.
7. What is the primary concern when installing modules on aging roofs?
A. Structural condition and remaining roof life
B. Utility rates
C. Property taxes
D. Conductor color
Answer: A
, Rationale: Roof replacement after installation can significantly increase costs.
8. A string contains one severely degraded module. What is the most likely
effect?
A. Reduced performance of the entire series string
B. Increased string efficiency
C. Higher inverter output
D. Reduced voltage drop
Answer: A
Rationale: A weak module can limit string performance.
9. Which component converts DC electricity from PV modules into AC
electricity?
A. Inverter
B. Combiner box
C. Junction box
D. Disconnect switch
Answer: A
Rationale: Inverters perform DC-to-AC conversion.
10. What is the primary purpose of load calculations during system design?
A. Determine electrical demand and system requirements
B. Select module color
C. Reduce roof loads
D. Improve aesthetics
Answer: A
Rationale: Load calculations support proper system sizing.
11. A PV array is producing significantly less power than expected despite full
sunlight. What should be investigated first?
A. Electrical connections and system diagnostics
B. Property boundaries