Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 47 pages
Exam (elaborations)

AFSB 152 CERTIFICATION EXAM 2026 COMPLETE Q AND A PREP PACK

Document preview thumbnail
Preview 4 out of 47 pages

AFSB 152 CERTIFICATION EXAM 2026 COMPLETE Q AND A PREP PACK

Content preview

AFSB 152 CERTIFICATION EXAM 2026
COMPLETE Q AND A PREP PACK

◉ Lido Roofing's work is generally subject to an implied warranty.
Which one of the following statements is correct regarding an
implied warranty for a roofing contractor?
- It typically applies for a 20-year period.
- It begins with the purchase of the materials.
- It does not begin until installation is completed.
- It includes coverage for excessive wear and tear.
Answer: It does not begin until installation is completed.


◉ Which one of the following is correct regarding the contractor's
risk in a cost-plus contract?
- The contractor's risk in a cost-plus contract is higher than it would
be in a fixed-price contract.
- There is more risk in a cost-plus contract than in a unit-price
contract.
- Cost-plus contracts expose the contractor to little or no risk
because costs are reimbursed.
- The "plus" in a cost-plus contract is a fixed amount and is not
related to the contractor's risk.

,Answer: Cost-plus contracts expose the contractor to little or no risk
because costs are reimbursed.


◉ KB Contracting entered a firm fixed-price contract to build a new
location for Mullen Markets. The construction contract includes a
bonus clause. Under this arrangement, KB Contracting will most
likely earn an incentive if it does which one of the following?
- Completes the job at a cost at least 5% below the original bid price.
- Completes the job with exceptional savings in both cost and time.
- Completes the work with exemplary quality.
- Completes the work within the prescribed period of time.
Answer: Completes the work within the prescribed period of time.


◉ Wilson Contracting was awarded a large federal construction
project. The Miller Act requires a contractor on a federal project to
post
- A performance bond and a labor and material payment bond.
- A labor and material payment bond only.
- A performance bond only.
- A bond covering state liens.
Answer: A performance bond and a labor and material payment
bond.

,◉ When estimating the costs for labor, in addition to the capabilities
of the available labor force, the estimator must be familiar with
- Union and local regulations that might affect what work a
particular subcontractor can perform
- The subcontractor's hours of operation and overtime guidelines
- Any union labor limitations for specialized laborers who work on
private construction projects
- The profit margins that are customary for similar types of jobs in
the market
Answer: Union and local regulations that might affect what work a
particular subcontractor can perform


◉ Which one of these statements most accurately describes the laws
and regulations with which architects must comply?
- A. Architects must comply with all federal, state, and local laws,
regulations, ordinances, requirements, and codes that apply to
construction projects
- Architects must comply with all federal, state, and local laws,
regulations, ordinances, requirements, and codes, as well as with
regulations and licensing requirements of the architectural
profession
- Architects must comply with regulations and licensing
requirements of the architectural profession, along with regulations
and licensing requirements for the construction firms

, - Architects must comply with regulations and licensing
requirements of the architectural profession, which takes
precedence over all other regulations and ordinances
Answer: Architects must comply with all federal, state, and local
laws, regulations, ordinances, requirements, and codes, as well as
with regulations and licensing requirements of the architectural
profession


◉ When contract documents specifically request two or more
alternative quotes (such as one with and one without some feature),
the contractor
- Should investigate the advantages and disadvantages of the
alternatives and include them in separate bids for each alternative
- Can choose to bid on only one of the quotes but must explain why
only one quote is furnished
- Should include any qualifying conditions for the alternatives, which
could ensure the contractor's responsiveness
- Must clearly furnish each of the requested quotes, or the bid might
be judged nonresponsive
Answer: Must clearly furnish each of the requested quotes, or the
bid might be judged nonresponsive


◉ One of the purposes of bid bonds is
- To assure the owner of completion of the project in the least
amount of time possible

Document information

Uploaded on
June 10, 2026
Number of pages
47
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GradeGalaxy
4.4
(9)
Sold
132
Followers
4
Items
44408
Last sold
2 hours ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions