b b b b b b b
CONTROL8THEDITION|JEROLDL.ZIMMERMAN|ALL
b b b b b b b b b
CHAPTERSVERIFIEDA+GRADESOLUTIONS2026–2027
b b b b b b
All chapter covered
b b
1
,Accounting for Decision Making andControl 8e Jerold Zimmerman (Test
u u u u u u u u u
Bank All Chapters, 100% Original Verified, A+ Grade)
b u u u u u u u u
TESTBANKANDSOLUTIONS u
1-1: Accountingand Control b
The controller of a small private college is complaining about the amount of work she is
b b b b b b b b b b b b b b b
required to do at the beginning of each month. The president of the university requires the
b b b b b b b b b b b b b b b b
controller to submit a monthly report by the fifth day of the following month. The monthly report
b b b b b b b b b b b b b b b b b
contains pages of financial data from operations. The controller was heard saying, "Why
b b b b b b b b b b b b b
does the president need all this information? He probably doesn't read half of the report.
b b b b b b b b b b b b b b b
bHe's an old English professor and probably doesn't know the difference between a cost and a
b b b b b b b b b b b b b b b
revenue."
b
Required:
a. What istheprobable roleofthemonthly report?
b b b b b
b. What is the controller's responsibility with respect to a president who
b b b b b b b b b b
doesn'tknowmuchaccounting?
b b b
2-1 : Fixed,Variable,andAverageCosts b b b b
Midstate University is trying to decide whether to allow 100 more students into the b b b b b b b b b b b b b
university. Tuition is $5000 per year. The controller has determined the following schedule of
b b b b b b b b b b b b b b
costs to educate students:
b b b b
Numberof Students b TotalCosts b
4000 $30,000,000
4100 30,300,000
4200 30,600,000
4300 30,900,000
The current enrollment is 4200 students. The president of the university has calculated the cost
b b b b b b b b b b b b b b
per student in the following manner: $30,600,000/4200 students = $7286 per student. The
b b b b b b b b b b b b b
president was wondering why the university should accept more students if the tuition is only
b b b b b b b b b b b b b b b
$5000.
b
2
, Test Bank and Solutions b b u
Required:
a. Whatiswrongwith thepresident'scalculation? b
b. Whatarethe fixedandvariable costsofoperating theuniversity? b b b
2-2 : TheElementsofCostVolumeProfit b b b b b
The MCompany’s variablecostsare 75% ofthesalespriceperunitandtheirfixed costs
b b b b b
are $240,000. If the company earned $60,000 in selling 150,000 units, what was the sales price
b b b b b b b b b b b b b b b b
perunit?
b b
2-3 : OpportunityCosts b
The First Church has been asked to operate a homeless shelter in part of the church. To
b b b b b b b b b b b b b b b b
operate a homeless shelter the church would have to hire a full time employee for
b b b b b b b b b b b b b b b
$1,200/month to manage the shelter. In addition, the church would have to purchase $400 of b b b b b b b b b b b b b b
supplies/month for the people using the shelter. The space that would be used by the shelter is
b b b b b b b b b b b b b b b b b
rented for wedding parties. The church averages about 5 wedding parties a month that pay rent of
b b b b b b b b b b b b b b b b b
$200 per party. Utilities are normally $1,000 per month. With the homeless shelter, the utilities
b b b b b b b b b b b b b b b
will increase to $1,300 per month.
b b b b b b
What is the opportunity cost to the church of operating a homeless shelter in the b b b b b b b b b b b b b b
church?
b
2-4 : b b b FixedandVariableCosts b b
The university athletic department has been asked to host a professional basketball
b b b b b b b b b b b
game at the campus sports center. The athletic director must estimate the opportunity cost of
b b b b b b b b b b b b b b b
holding the event at the sports center. The only other event scheduled for the sports center that
b b b b b b b b b b b b b b b b b
evening is a fencing match that would not have generated any additional costs or revenues.
b b b b b b b b b b b b b b b
bThe fencing match can be held at the local high school, but the rental cost of the high school gym
b b b b b b b b b b b b b b b b b b b
would be $200. The athletic director estimates that the professional basketball game will
b b b b b b b b b b b b b
require 20 hours of labor to prepare the building. Clean-up depends on the number of spectators.
b b b b b b b b b b b b b b b b
bThe athletic director estimates the time of clean-up to be equal to 2 minutes per spectator. The
b b b b b b b b b b b b b b b b
labor would be hired especially for the basketball game and would cost $8 per hour. Utilities
b b b b b b b b b b b b b b b b
will be $500 greater if the basketball game is held at the sports center. Allothercosts would be
b b b b b b b b b b b b b b b b b b
coveredbytheprofessionalbasketball team.
b b b b b b
Required:
a. What isthevariablecost of havingonemorespectator? b b b
b. Whatistheopportunitycostofallowingtheprofessionalbasketballteamtouse the
b b b b b b b b b b b b
sports center if 10,000 spectators areexpected?
b b b b b b
3
, Test Bank and Solutions b b u
c. Whatistheopportunitycostofallowingtheprofessionalbasketballteamtouse the
b b b b b b b b b b b b
sports center if 12,000 spectators areexpected?
b b b b b b
2-5 : b b b OpportunityCostofAttractingIndustry b b b b
The Itagi Computer Company From Japan is looking to build a factory for making
b b b b b b b b b b b b b
DVD burners in the United States. The company is concerned about the safety and well-
b b b b b b b b b b b b b b b
being of its employees and wants to locate in a community with good schools. The company also
b b b b b b b b b b b b b b b b
wants the factory to be profitable and is looking for subsidies from potential communities.
b b b b b b b b b b b b b b
bEncouraging new business to create jobs for citizens is important for communities, especially
b b b b b b b b b b b b
communities withhighunemployment.
b b
Wellville has not been very well since the shoe factory left town. The city officials have b b b b b b b b b b b b b b b
been working on a deal with Itagi toget the company tolocate in Wellville. Itagi officials have
b b b b b b b b b b b b b b b b
identifieda20acreundevelopedsite. Thecityhastentativelyagreedtobuythesitefor
b b b b b b b b b b b b b b b b
$50,000 for Itagi and not require any payment of property taxes on the factory by Itagi for the first
b b b b b b b b b b b b b b b b b b
fiveyears of operation. The property tax deal will save Itagi
b b b b b b b b b b b
$3,000,000 in taxes over the five years. This deal was leaked to the local newspaper. The
b b b b b b b b b b b b b b b
headlinesthenextdaywere: "WellvilleGivesAway$3,000,000+toJapaneseCompany".
b b b b b b b b b b b b
Required:
a. Do theheadlines accurately describethedealwith Itagi?
b b b b
b. WhataretherelevantcostsandbenefitstothecitizensofWellvilleofmakingthis
b b b b b b b b b
deal?
b
2-6 : Cost,Volume,ProfitAnalysis b b b
With the possibility of the US Congress relaxing restrictions on cutting old growth, a local
b b b b b b b b b b b b b b
lumber company is considering an expansion of its facilities. The company believes it can sell
b b b b b b b b b b b b b b b
lumber for $0.18/board foot. A board foot is a measure of lumber. The tax rate for thecompany
b b b b b b b b b b b b b b b b b b
is30percent. Thecompanyhasthefollowingtwoopportunities:
b b b b b b b b b
• Build Factory A with annual fixed costs of $20 million and variable costs of
b b b b b b b b b b b b b
$0.10/boardfoot. Thisfactoryhasanannualcapacityof500millionboardfeet. b b b b b b b b b b
• Build Factory B with annual fixed costs of $10 million and variable costs of
b b b b b b b b b b b b b
$0.12/boardfoot. Thisfactoryhasanannualcapacityof300millionboardfeet. b b b b b b b b b b
Required:
a. What isthebreak-even point inboardfeet forFactoryA?
b b u b b b b
4