Utility Contractor EXAM STUDY GUIDE 2026/2027 ACCURATE QUESTIONS WITH CORRECT DETAILED SOLUTIONS || 100% GUARANTEED PASS NEWEST VERSION 1. What is the utility ticket number to call in the USA? - ANSWER 811 2. Is a typical sewer system a pressure system? - ANSWER No 3. What is the contractor with a direct contract with the owner called? - ANSWER Prime Contractor 4. What does OSHA stand for? - ANSWER Occupational Safety and Health Administration 5. Is a daily diary or daily job report admissible as evidence in court? - ANSWER Yes 6. What is a general rule of thumb for the thickness of each lift when making a fill? - ANSWER About 8 inches thick 7. What is the term for the time it takes to complete an activity from start to finish? - ANSWER Cycle Time 8. What is the most common sewer pipe used today? - ANSWER SDR-35 9. Are plans construction drawings for a project? - ANSWER No 10. What color is used to mark underground electrical utilities in the USA? - ANSWER Red 11. What type of construction do contractors who build roads, bridges, and underground systems work in? - ANSWER Civil Construction 12. Are sewer lines perforated? - ANSWER No 13. What is the term for adding or removing water from soil? - ANSWER Moisture Conditioning 14. Are leach lines in a drain field laid level? - ANSWER Yes 15. Should workers be paid prevailing wage on private jobs? - ANSWER No 16. What is the most common pipe used in domestic water system mainlines? - ANSWER C900 pipe 17. What does W stand for? - ANSWER Water 18. What does DWW stand for? - ANSWER Domestic Wastewater 19. What does CW stand for? - ANSWER Cooling Water 20. What does NCCW stand for? - ANSWER Non-Contact Cooling Water 21. What does FM stand for? - ANSWER Force Main 22. What does LS stand for? - ANSWER Lift Station 23. What does PS stand for? - ANSWER Pump Station 24. What does WTP stand for? - ANSWER Water Treatment Plant 25. What does SC stand for? - ANSWER Substantial Completion 26. What does AHJ stand for? - ANSWER Authority Having Jurisdiction 27. What does MGD stand for? - ANSWER Million Gallons per Day 28. What does FPD stand for? - ANSWER Feet Per Day 29. What does IFC stand for? - ANSWER Issued for Construction 30. What is mobilization? - ANSWER Preparing the site for construction by bringing in crews, equipment, trailers, materials, and temporary facilities. 31. What is clearing? - ANSWER Removing trees, brush, vegetation, debris, or obstructions from the construction area. 32. What is access/staging? - ANSWER Setting up routes, laydown areas, storage zones, and work areas for equipment, crews, and materials. 33. What is erosion control? - ANSWER Measures used to prevent soil, sediment, and runoff from leaving the site or damaging nearby areas. 34. What are utility locates? - ANSWER The process of identifying existing underground utilities before excavation to avoid strikes or damage. 35. What is survey/layout? - ANSWER Marking the correct location, alignment, elevation, and limits of construction work in the field. 36. PM - ANSWER Project Manager. 37. PMO - ANSWER Project Management Office: Corporate Group that manages project management process. 38. POD - ANSWER Plan of the day. 39. POLA - ANSWER Port of Los Angeles. 40. P&P Bond - ANSWER Payment & Performance Bond: Often required by customers to ensure that a contractor executes the contract work properly. 41. PPE - ANSWER Personal Protection Equipment. 42. PreActivity Meeting - ANSWER Meeting to convey work plans, installation and quality requirements to installation crews. 43. Pre Award Meeting - ANSWER Internal AE meeting hosted by Estimating team for major projects. 44. PreConmenuper - ANSWER Pre Construction Meeting: Generally required by customer to establish contract & administrative requirements prior to start of work. 45. PreFab - ANSWER The act of making building components in another location better suited to their construction. 46. PreStart - ANSWER Checklist of key AE PM planning processes used to gauge whether project teams are properly prepared to begin work on site. 47. Punchlist - ANSWER List of work items requiring completion, touch up, repair, or rework prior to Final Completion of contract. 48. PO - ANSWER Purchase Orders - A documented financial commitment that details the types, quantities, and agreed-upon prices for products or services. 49. PVC - ANSWER Plastic Conduit. 50. QAC - ANSWER Quality Audit Checklist used as a guide to audit a project's status in maintaining key PM Processes. 51. QA - ANSWER "Quality Assurance" - Ensures that QC plans are effectively managing the contract and Quality requirements. 52. QC - ANSWER "Quality Control" - Ensures that work conforms to contract requirements. 53. QCP - ANSWER Quality Control Plan. 54. What is a pressure test? - ANSWER A test that verifies pipe can withstand required operating or test pressure.

Show more Read less
Institution
Utility Contractor
Course
Utility Contractor

Content preview

Utility Contractor EXAM STUDY GUIDE
2026/2027 ACCURATE QUESTIONS WITH
CORRECT DETAILED SOLUTIONS ||
100% GUARANTEED PASS
<NEWEST VERSION>


1. What is the utility ticket number to call in the USA? - ANSWER ✔ 811

2. Is a typical sewer system a pressure system? - ANSWER ✔ No

3. What is the contractor with a direct contract with the owner called? -
ANSWER ✔ Prime Contractor

4. What does OSHA stand for? - ANSWER ✔ Occupational Safety and
Health Administration

5. Is a daily diary or daily job report admissible as evidence in court? -
ANSWER ✔ Yes

6. What is a general rule of thumb for the thickness of each lift when making a
fill? - ANSWER ✔ About 8 inches thick

7. What is the term for the time it takes to complete an activity from start to
finish? - ANSWER ✔ Cycle Time

8. What is the most common sewer pipe used today? - ANSWER ✔ SDR-35

9. Are plans construction drawings for a project? - ANSWER ✔ No

10.What color is used to mark underground electrical utilities in the USA? -
ANSWER ✔ Red

,11.What type of construction do contractors who build roads, bridges, and
underground systems work in? - ANSWER ✔ Civil Construction

12.Are sewer lines perforated? - ANSWER ✔ No

13.What is the term for adding or removing water from soil? - ANSWER ✔
Moisture Conditioning

14.Are leach lines in a drain field laid level? - ANSWER ✔ Yes

15.Should workers be paid prevailing wage on private jobs? - ANSWER ✔
No

16.What is the most common pipe used in domestic water system mainlines? -
ANSWER ✔ C900 pipe

17.What does W stand for? - ANSWER ✔ Water

18.What does DWW stand for? - ANSWER ✔ Domestic Wastewater

19.What does CW stand for? - ANSWER ✔ Cooling Water

20.What does NCCW stand for? - ANSWER ✔ Non-Contact Cooling Water

21.What does FM stand for? - ANSWER ✔ Force Main

22.What does LS stand for? - ANSWER ✔ Lift Station

23.What does PS stand for? - ANSWER ✔ Pump Station

24.What does WTP stand for? - ANSWER ✔ Water Treatment Plant

25.What does SC stand for? - ANSWER ✔ Substantial Completion

26.What does AHJ stand for? - ANSWER ✔ Authority Having Jurisdiction

27.What does MGD stand for? - ANSWER ✔ Million Gallons per Day

,28.What does FPD stand for? - ANSWER ✔ Feet Per Day

29.What does IFC stand for? - ANSWER ✔ Issued for Construction

30.What is mobilization? - ANSWER ✔ Preparing the site for construction by
bringing in crews, equipment, trailers, materials, and temporary facilities.

31.What is clearing? - ANSWER ✔ Removing trees, brush, vegetation, debris,
or obstructions from the construction area.

32.What is access/staging? - ANSWER ✔ Setting up routes, laydown areas,
storage zones, and work areas for equipment, crews, and materials.

33.What is erosion control? - ANSWER ✔ Measures used to prevent soil,
sediment, and runoff from leaving the site or damaging nearby areas.

34.What are utility locates? - ANSWER ✔ The process of identifying existing
underground utilities before excavation to avoid strikes or damage.

35.What is survey/layout? - ANSWER ✔ Marking the correct location,
alignment, elevation, and limits of construction work in the field.

36.PM - ANSWER ✔ Project Manager.

37.PMO - ANSWER ✔ Project Management Office: Corporate Group that
manages project management process.

38.POD - ANSWER ✔ Plan of the day.

39.POLA - ANSWER ✔ Port of Los Angeles.

40.P&P Bond - ANSWER ✔ Payment & Performance Bond: Often required
by customers to ensure that a contractor executes the contract work properly.

41.PPE - ANSWER ✔ Personal Protection Equipment.

, 42.PreActivity Meeting - ANSWER ✔ Meeting to convey work plans,
installation and quality requirements to installation crews.

43.Pre Award Meeting - ANSWER ✔ Internal AE meeting hosted by
Estimating team for major projects.

44.PreConmenuper - ANSWER ✔ Pre Construction Meeting: Generally
required by customer to establish contract & administrative requirements
prior to start of work.

45.PreFab - ANSWER ✔ The act of making building components in another
location better suited to their construction.

46.PreStart - ANSWER ✔ Checklist of key AE PM planning processes used
to gauge whether project teams are properly prepared to begin work on site.

47.Punchlist - ANSWER ✔ List of work items requiring completion, touch
up, repair, or rework prior to Final Completion of contract.

48.PO - ANSWER ✔ Purchase Orders - A documented financial commitment
that details the types, quantities, and agreed-upon prices for products or
services.

49.PVC - ANSWER ✔ Plastic Conduit.

50.QAC - ANSWER ✔ Quality Audit Checklist used as a guide to audit a
project's status in maintaining key PM Processes.

51.QA - ANSWER ✔ "Quality Assurance" - Ensures that QC plans are
effectively managing the contract and Quality requirements.

52.QC - ANSWER ✔ "Quality Control" - Ensures that work conforms to
contract requirements.

53.QCP - ANSWER ✔ Quality Control Plan.

54.What is a pressure test? - ANSWER ✔ A test that verifies pipe can
withstand required operating or test pressure.

Written for

Institution
Utility Contractor
Course
Utility Contractor

Document information

Uploaded on
June 8, 2026
Number of pages
32
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$14.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ProfBenjamin Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
701
Member since
1 year
Number of followers
17
Documents
3932
Last sold
6 hours ago
EXCELLENT ACHIEVERS LIBRARY

As a professional tutor, I provide exceptional assistance with homework, quizzes, and exams across various subjects, including Psychology, Nursing, Biological Sciences, Business, Engineering, Human Resource Management, and Mathematics. I am dedicated to offering high-quality support and ensuring that all work meets scholarly standards. To enhance the effectiveness of our services, I work with a team of experienced tutors to create comprehensive and effective revision materials. Together, we are committed to helping students achieve excellent grades through our collaborative efforts and expertise.

Read more Read less
3.8

143 reviews

5
62
4
20
3
37
2
12
1
12

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions