MANAGEMENT PRACTICE EXAM 1 Qs & As
1. One definition of the term "Contract" is a mutual man- A. duties
ifestation (or understanding) of assent to par- B. undertakings
ticular that is supported by consideration (an exchange C.
obligations
of something of value to one side or harm to D. either a or c
the oth- er).
2. When a building is evaluated by a registered Code oflcial
design professional, the evaluation findings
shall be submit- ted to the
3. What is the maximum number of employees 20
you can have on a job site with only one toilet
facility?
if it is written into the No-
4. When can a Notice of Commencement be tice of
extended past one year? Commencement
5. If there is no conflict in the code between a Specific
general requirement and a specific
requirement, the
requirement shall apply.
6. 6. Prior to site layout, the contractor should: locate surface encum-
brances that may pose
a hazard to employees
7. 7. Which is NOT a delay factor when accessible
determining pro- duction efficiency parking
percentages? spaces is
.
8. 8. . If a parking facility provides 160 parking
spaces, the minimum number of required
1/
15
, RESIDENTIAL CONTRACTOR PROJECT
MANAGEMENT PRACTICE EXAM 1 Qs & As
9. 9. Which of the following does not require code financial incentives
com- pliance by license or registration?
6
Single family residential
2/
15