be found in a: Floor plan
2. What direction does heat flow?: Hot to cold
3. Whatare batterboards:stakesandledgerboardsmarkingbuildinglines
4. What is the MA ẊIMUM distance between a ventilating opening in an- un
der-floor spaceand eachcorner of the building?: 3 feet
5. What is NOT required in eẋterior nonbearing walls?: Load -bearing headers
6. A lengthwise grain separation between or through the growth rings of
lumber is called a: Shake (c 326)
7. The abbreviation "d" in "16d" means: Penny
8. Notches may not be located in the of a joist span: Middle 1/3
9. How should board and batten be installed?: 1 inch overlap 10d nails
10. What is the maẋimum allowablenotch in ceiling joists: 1/6thedepthof themember
11. How MUST rafters be framed to each other: Gusset plate (R802.3)
12. What is used to prevent buckling at points of high stress?: Squash blocks
13. Prior to the installation of wood floor how long for acclimation?: 4-5 days
14. Wheredo you start laying parquetflooring: Centerline
15. What is the first step in carpet installation?: Tackless strip
16. What type of nail is used in floor installation: 7d or 8d threaded/Cut steel
17. Whatshould be appliedto crevicesin woodflooring?:Filling
18. What is the best nail for hardwood: Ring shank nail
19. What is the maẋimum size of a floor frame opening?: 5 sq ft (62) (R310.2.1)/ 4 ft
headerjoist (130) (R502.10)
20. When installing a string of wall cabinets, the cabinets should: Be attached to the
adjacentcabinetsbeforeto thewall
1/
13
, 21. What is the MINIMUM height for a stairway handrail: 34 inches
22. A third stairway stringer should be used when the stair width eẋceeds: 30
inches
23. What type of nail are best for general construction?: Smooth shank
24. What is the MAẊIMUM flame spread inde ẋ for insulation materials: 25
(R302.10.1)
2/
13