Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 17 pages
Exam (elaborations)

NEIEP 800 Final Exam (PDF) | 100 Q&A | Elevator

Document preview thumbnail
Preview 3 out of 17 pages

INSTANT PDF DOWNLOAD. NEIEP 800 Final Exam with 100 questions and verified answers. Covers welding tack weld specifications (1 inch, 180 degrees apart), power unit pump drive types (belt or direct coupled), pump pulsation silencer/muffler, and bolster assembly plunger mounting. Pass guaranteed.

Content preview

NEIEP 800 Final Exam
Questions and Verified Answers
100% Guarantee Score Pass

Consist of 100 Questions and Answers




1. When welding a joint, lay inch tack welds degrees apart, shift it 90

degrees and lay two more 1 inch tack welds 180 degrees apart.

Ans>> 1, 180



2. On power units having the motor beneath the tank, the pump may be either
driven or coupled.

Ans>> belt, direct

3. The purpose of the / is to silence the effect of any pulsations in the pump

output and should be as close to the pump as possible.

Ans>> silencer, muffler




4. On Bolsters/Bolster Assembly, the plunger is fastened to the
which is then mounted to the center of the Bolster Assembly.
1/5

,Ans>> platen plate




5. With wye-delta, reduced current starting is accomplished without the need for .

Ans>> resistors



6. run buttons should run the platform and sling at leveling speeds only.

Ans>> Temporary




7. A consists of a piston held closed by an adjustable spring and must open at a

certain pressure to prevent any further increase in pressure.-



Ans>> relief valve




8. A lowering valve allows the car to be lowered at a speed not exceed- ing 20fpm in case

of power failure.

Ans>> manual

9. As the oil temperature changes, the will change as well and will effect

the performance, more specifically, the leveling and approach of the elevator.

Ans>> viscosity



10. Be sure wellways are properly to avoid accidental injury to you, your team or

anyone working outside of our industry.

2/5

, Ans>> barricaded




11. Barricades around the wellway must be inches high and be capable of

withstanding a lb force.

Ans>> 42, 200



12. A protects you if you come in contact with a hot wire or component and then come in

contact with ground. It opens the circuit and diverts the supplied current to ground.

Ans>> GFCI




3/5

Document information

Uploaded on
June 4, 2026
Number of pages
17
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
10
Followers
9
Items
635
Last sold
1 year ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions