Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 14 pages
Exam (elaborations)

ACI Concrete Field Testing Exam | Questions with 100% Correct Answers | Verified | Latest Update 2026/2027

Document preview thumbnail
Preview 2 out of 14 pages

ACI Concrete Field Testing Exam | Questions with 100% Correct Answers | Verified | Latest Update 2026/2027

Content preview

ACI Concrete Field Testing Exam | Questions with
100% Correct Answers | Verified | Latest Update
2026/2027

Save




Terms in this set (162)



ASTM 172 Describes procedures for obtaining samples of
fresh concrete for plastic properties testing and
casting strength specimens


QA Program Testing performed by the owner, verifies QC


QC Programs Testing performed by the contractor


ASTM 172 includes sampling from Stationary Mixers (central mixers)
Paving and truck mixers
Agitating and non-agitating equipment
Continuous mixers (volumetric)


Composite sample Two or more portions of concrete obtained
generally from the middle portion of the batch
The portions of concrete should be spaced or
timed separating them at equal intervals


If casting strength specimens, need 1 cubic foot or roughly half a wheel barrow
this much concrete

, What must be done when an Wet sieve
aggregate is too large for testing
equipment?


Nominal Maximum Aggregate Size Smallest specified sieve in which 100% of the
material is allowed to pass


Composite sampling time limit Time between the first and final portion of the
composite sample shall not exceed 15 minutes


Cover the sample To protect it from
Sun, wind, contamination and rapid evaporation


Plasticity testing time limit Begin tests for temp, slump and air within 5 minutes
after obtaining the final portion of the composite
sample


Compressive strength testing time Begin casting strength test specimens within 15
limit minutes after fabricating the composite sample
Cylinders
Beams
Prisms


Sampling should normally be on concrete as it is delivered to the project site and
performed after all water and admixtures have been added
Some spec may require sampling from other points
such as the point of discharge of a pump

Document information

Uploaded on
June 4, 2026
Number of pages
14
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.89

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SpencerHenderson
3.7
(53)
Sold
266
Followers
117
Items
47770
Last sold
2 weeks ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions