During assembly of a long boom, the hog lines are connected at the maximum cantilever point
and the boom is slightly lifted off the ground, which pins are to be removed next - Answer>>>
The bottom pins ahead of the cantilever point
What is the first thing an operator should do before going under a low pipe rack? - Answer>>>
Post a signal person to check clearance
As a rule of thumb, when working over water with a man basket, are the people inside required
to wear a belt/harness - Answer>>> No harness or belt required
If not listed in the load/capacity charts for a hydraulic crane, and you are in between boom
lengths, you should: - Answer>>> Use the next longer length or the next shorter length,
whichever has the lesser value
During setup how do you determine machine clearances (counterweight, boom, outrigger)? -
Answer>>> Measure for correct distances
What is the minimum design factor required for a right regular lay main, boom, or auxiliary hoist
rope? - Answer>>> 3.5
When telescoping the boom section of an R/T, which section should be telescoped first? -
Answer>>> Manufacturer's recommendations
When operating a crawler crane, what is the most allowable quadrant of operation - Answer>>>
Side
Jib capacity is based on what - Answer>>> Structure
What is not a cause of impact loading? - Answer>>> General lever contact
What does the signal person means when they stand with their hands by their waist side and
hands clasps together? - Answer>>> Dog everything