Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

LOW GWP QUESTIONS WITH ACCURATE ANSWERS

Rating
-
Sold
-
Pages
17
Grade
A+
Uploaded on
28-05-2026
Written in
2025/2026

2 - Refrigerant cylinders should be transported in the upright position to ensure; correct answer C - Pressure relief valve 3 - Tools used during the installation or service of systems charged with a flammable refrigerant must be; correct answer D - rated for use with flammable refrigerants 4 - The first stage of the evacuation process which removes non-condensables from a system is called; correct answer A - Degassing 5 - Once a flammable refrigerant has been recovered and stored in a recovery cylinder; correct answer B - Safe Distances 6 - In a vapor-compression refrigeration circuit the term condensable is used to describe; correct answer B - any gas that will not condense to a liquid 7 - Which of the following can affect the speed and efficiency of an evacuation? correct answer A - The capacity of the vacuum pump and hoses being used. 8 - Which of the following refrigerants is exempt from the EPA's recovery mandate? correct answer B - R-290 10 - Atmospheric pressure (0 psig) is equal to approximately; correct answer D - 760,000 Microns 11 - To avoid fractionation, blended refrigerants should be; correct answer A - charged as a liquid

Show more Read less
Institution
Engineering Management
Course
Engineering Management

Content preview

LOW GWP REFRIGERANT PRACTICE QUESTIONS WITH
ACCURATE ANSWERS
After installation, the refrigerant piping for an A2L system must be:


cleaned with an alcohol-based solution to remove grease and oil.


pressurized with dry nitrogen to perform a leak test.


pressurized with a non-flammable refrigerant (A1) to perform a leak test.


vibration tested using whichever method is approved by the local code authority.
correct answer pressurized with dry nitrogen to perform a leak test.


After reaching the required recovery level on a system that is charged with an A2L
refrigerant:


a nitrogen sweep should be done to remove any residual refrigerant vapor.


an alcohol-based solution must be used to remove any oil or grease.


the refractive index of the compressor must be tested.


the system must stand idle for 60 minutes prior to beginning any work on it.
correct answer a nitrogen sweep should be done to remove any residual
refrigerant vapor.

,An uppercase letter designation (R-407A, R-407B, R-407C) is used when
refrigerant blends are:


Composed of the same refrigerant, but with the same percentages of each.


Composed of different refrigerants but have the same thermodynamic properties.


Composed of the same refrigerants but manufactured by different companies.


Composed of the same refrigerants, but with different percentages of each.
correct answer Composed of the same refrigerants, but with different
percentages of each.


Atmospheric pressure (0 PSIG) is equal to approximately:


25 inches of mercury.


500 microns.


760,000 inches of mercury.


760,000 microns. correct answer 760,000


Before beginning the installation of a system that is charged with an A2L
refrigerant:

, a local code official must approve the site of the installation.


NFPA 704 hazard placards must be placed in visible locations around the
perimeter of the jobsite.


permanent mechanical ventilation must be installed in the structure.


verify that all the components being installed are designed for use with A2L
refrigerants. correct answer verify that all the components being installed are
designed for use with A2L refrigerants.


DOT regulations require refrigerant cylinders over 2.2 pounds of a 2L refrigerant
to be equipped with:


A dip tube.


A fire suppression mechanism.


Pressure relief valve.


Locking valve caps. correct answer Pressure relief valve.


EPA Section 608 regulations require that if a system is charged with a flammable
refrigerant, the equipment must have:

Written for

Institution
Engineering Management
Course
Engineering Management

Document information

Uploaded on
May 28, 2026
Number of pages
17
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$16.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
starwid Yale University
View profile
Follow You need to be logged in order to follow users or courses
Sold
20
Member since
1 year
Number of followers
1
Documents
10266
Last sold
1 day ago

3.3

4 reviews

5
1
4
0
3
2
2
1
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions