After Class
Certification
Exam Study
–NERC
After
Guide
Class
Certification
withExam
Key Study
–
Concepts
After
Guide
Class
andwith
Power
Exam
Key System
Study
Concepts
Guide
Review
andwith
Power
Notes.pdf
Key System
Concepts
Review
and Power
Notes.pdf
System Review Notes.pdf
NERC Certification
– After Class Exam
Study Guide with
Key Concepts and
Power System
Review Notes
NERC Certification –NERC
After Class
Certification
Exam Study
–NERC
After
Guide
Class
Certification
withExam
Key Study
–
Concepts
After
Guide
Class
andwith
Power
Exam
Key System
Study
Concepts
Guide
Review
andwith
Power
Notes.pdf
Key System
Concepts
Review
and Power
Notes.pdf
System Review Notes.pdf
,NERC Certification_ After Class Exam.pdf NERC Certification_ After Class Exam.pdf NERC Certification_ After Class Exam.pdf
Balancing Authority A is importing MW and has a tie- b . The Balancing Authority's generators on AGC will decrease output
line flowing into them when the meter fails to zero.
Which of the following statements is true?
a . The Balancing Authority's frequency will drop
b . The Balancing Authority's generators on AGC will
decrease output
c. The Balancing Authority's frequency will increase
d. The Balancing Authority's ACE reading will decrease
Balancing Authority A has tie - line meter fail to zero on a . The Balancing Authority's total demand indication will increase
a line that is exporting 200 MWs . Which of the
following statements is true ?
a . The Balancing Authority's total demand indication
will increase
b . The Balancing Authority's generators on AGC will
decrease output
c . The Balancing Authority's frequency will decrease
d . The Balancing Authority's ACE reading will increase
NERC Certification_ After Class Exam.pdf NERC Certification_ After Class Exam.pdf NERC Certification_ After Class Exam.pdf
,NERC Certification_ After Class Exam.pdf NERC Certification_ After Class Exam.pdf NERC Certification_ After Class Exam.pdf
How does a System Operator realize the power system d . The rate of decrease of the voltage increases with the load
is getting close to the end of its available reactive
resources ?
a. The voltage is increasing
b. The rate of decrease / increase of the voltage does
not relate to change in the load
c. The rate of increase of the voltage decreases with
the load
d . The rate of decrease of the voltage increases with
the load
Which of the following indications would result from a c. your ACE stays the same and frequency decreases
significant loss of generation on an external BA ?
a. your ACE goes up and frequency stays the same
b. your ACE stays the same and frequency increases
c. your ACE stays the same and frequency decreases
d. your ACE goes down and frequency drops
You have restored a line to service after an outage . c. Call the crew that restored the line to check reading on each phase
After shows no current flow . What is your next action ?
closing the line , one of the phases
a. Have the on - site crew open the line
b. Notify your RC
c. Call the crew that restored the line to check reading
on each phase
d . Report RTU problem
NERC Certification_ After Class Exam.pdf NERC Certification_ After Class Exam.pdf NERC Certification_ After Class Exam.pdf
, NERC Certification_ After Class Exam.pdf NERC Certification_ After Class Exam.pdf NERC Certification_ After Class Exam.pdf
Which of the following would classify as an Operating c. Directing a Generator Operator to maintain current MVAR output of a
Instruction ? generator
a. Requesting generator status from a Generator
Operator
b. Discussing Operating Plan with an Adjacent
Transmission Operator
c. Directing a Generator Operator to maintain current
MVAR output of a generator
d. Requesting outage information from a Distribution
Provider
After the winter morning peak , you have CTs base a . Take your CTs off-line
loaded unable to decrease output and other units
unable to regulate any lower . Nuclear units are loaded
and your solar is starting to pick up . ACE is trending up
and you have no regulation . What would you do ?
a . Take your CTs off-line
b . Increase Interchange out
c . Curtail solar power production
d . Consider available spinning reserve and replace
resources planned for the day
NERC Certification_ After Class Exam.pdf NERC Certification_ After Class Exam.pdf NERC Certification_ After Class Exam.pdf