CEPSCI EXAM STUDY GUIDE 2026/2027 ACCURATE QUESTIONS WITH CORRECT DETAILED SOLUTIONS || 100% GUARANTEED PASS NEWEST VERSION 1. 1972 clean water act - ANSWER Administered by the US environmental protection agency (EPA) Created the NPDES 2. 1987 - ANSWER Amendment to CWA CALLED WATER QUALITY ACT 3. NPDES in south carolina - ANSWER South Carolina is NPDES delegated state. 4. NPDES regulations are administered by - ANSWER SCDHEC 5. CGP authorizes - ANSWER stormwater discharges from construction sites 6. Who must obtain NPDES coverage - ANSWER land disturbing activities greater than or equal to 1 acre 7. -land disturbance less than 1 ac within 1/2 miles of water body in SC costal zone 8. NPDES permits are issued to - ANSWER operator-person or company for a particular discharge 9. primary permittee - ANSWER -has day to day operational control to ensure compliance with SWPP 10. -typically the owner or developer 11. primary permittee responsibilites - ANSWER submit NOI, Preparation of the C_SWPPP 12. Secondary permittee - ANSWER individual lot owner or residential builder that conducts land disturbing activity limited to an individual lot or group of lots as part of approved LCP of development 13. contractors - ANSWER must on Contractor Certification- D-0437 14. On-Site SWPPP - ANSWER SCDHEC CGP, NOI, NPDES coverage approval letter, Contractor Certifications, Local Approvals, USACE approvals, Critical area permit(coast) 15. OS_SWPPP - ANSWER a copy of signed and certified SWPPP, NOI, and CGP coverage letter from DHEC must be retained at site or electronically accessible 16. 3 types of PAM - ANSWER dry/powder polyacrylamides liquid polyacrylamides solid/block polyacrylamides 17. Sediment control BMP's - ANSWER sediment tube ditch check stabilized construction entrance filter fabric inlet protection block and gravel inlet protection hardware fabric and stone inlet protection pre-fabricated inlet protection 18. water surface withdrawal - ANSWER when discharging from sediment basins, utilize outlet structures that only withdraw water from near the waters surface within the basin, unless infeasible 19. what are the additional requirements for sediment basins - ANSWER surface water withdrawal ( skimmers or stop log risers) Clean out stake ( 1/2 of sediment storage volume) Public safety addressed, (as applicable) safety fences and signs, vector control(mosquitoes) sediment forebays (as applicable) Porous baffles (as applicable) 3 row minimum/ may NOT use silt fence 20. Sediment basin - ANSWER This sediment control BMP is a structure designed to capture sediment from storm water runoff before it leaves construction site. Basin de-watering is achieved through riser and pipe leading to outlet on downstream side of embankment. NOTE: Near surface withdrawal required in current CGP. 21. Installation of sediment basins - ANSWER This sediment control BMP should be constructed before any grading takes place within drainage area. This BMP with earthen embankments should be outfitted with de-watering pipe and riser set just above sediment removal cutoff level. Cleanout stake must be installed showing 1/2 sediment storage volume. 22. Sediment dam - ANSWER aka Trap. This sediment control BMP is formed by excavating or placing earthen embankment across drainage swale. An outlet or spillway is constructed using No. 5 washed stone and Class B riprap aggregate. 23. Installation of sediment dam - ANSWER This sediment control BMP specifications: 1. Upstream side of outlet should be lined with uniform 6 inch thick layer of No. 5 stone. 2. Allow stone to extend downstream past toe of embankment. 3. Mark sediment cleanout level of dam with stake at 1/2 sediment storage volume. 4. All areas of sediment dam should be seeded except for bottom of basin. 24. Filter fabric inlet protection is the most appropriate BMP of choice in situations where the flow rate is: a. High ( 0.5 cfs) b. Medium (~ 0.5 cfs) c. Low ( 0.5 cfs) d. Frequent - ANSWER c. Low ( 0.5 cfs) 25. Which of the following would not file a Notice of Intent (NOI) prior to any land disturbing activities? a. Secondary Permittee b. Utility Provider c. Compliance Inspector d. Primary Permittee - ANSWER c. Compliance Inspector 26. Final site stabilization is achieved when percent vegetative cover on all disturbed areas is at least the following: a. 65% b. 70% c. 80% d. 90% - ANSWER b. 70% 27. The sediment control structure in the center right side of the photo above is a: a. Rock-filter fabric inlet b. Rock construction entrance c. Rock ditch check d. Rock spillway for a sediment trap - ANSWER d. Rock spillway for a sediment trap 28. Consider the following situation: You observe bulldozer tracks with dozer traveling parallel to the contour. The statement that you would use in an inspection report about the situation shown is most nearly. a. The bulldozer tracks indicate that the tracking was done in the incorrect direction. b. The bulldozer tracks indicate that the tracking was done in the correct direction. c. The situation is an improper application of tracking and should be replaced immediately with sod. d. ECB would not be appropriate on the site because the slope is too flat. - ANSWER a. The bulldozer tracks indicate that the tracking was done in the incorrect direction.

Show more Read less
Institution
CEPSCI
Course
CEPSCI

Content preview

CEPSCI EXAM STUDY GUIDE 2026/2027
ACCURATE QUESTIONS WITH CORRECT
DETAILED SOLUTIONS ||
100% GUARANTEED PASS
<NEWEST VERSION>


1. 1972 clean water act - ANSWER ✔ Administered by the US
environmental protection agency (EPA) Created the NPDES

2. 1987 - ANSWER ✔ Amendment to CWA CALLED WATER QUALITY
ACT

3. NPDES in south carolina - ANSWER ✔ South Carolina is NPDES
delegated state.

4. NPDES regulations are administered by - ANSWER ✔ SCDHEC

5. CGP authorizes - ANSWER ✔ stormwater discharges from construction
sites

6. Who must obtain NPDES coverage - ANSWER ✔ land disturbing
activities greater than or equal to 1 acre
7. -land disturbance less than 1 ac within 1/2 miles of water body in SC costal
zone

8. NPDES permits are issued to - ANSWER ✔ operator-person or company
for a particular discharge

9. primary permittee - ANSWER ✔ -has day to day operational control to
ensure compliance with SWPP
10.-typically the owner or developer

,11.primary permittee responsibilites - ANSWER ✔ submit NOI, Preparation
of the C_SWPPP

12.Secondary permittee - ANSWER ✔ individual lot owner or residential
builder that conducts land disturbing activity limited to an individual lot or
group of lots as part of approved LCP of development

13.contractors - ANSWER ✔ must on Contractor Certification- D-0437

14.On-Site SWPPP - ANSWER ✔ SCDHEC CGP, NOI, NPDES coverage
approval letter, Contractor Certifications, Local Approvals, USACE
approvals, Critical area permit(coast)

15.OS_SWPPP - ANSWER ✔ a copy of signed and certified SWPPP, NOI,
and CGP coverage letter from DHEC must be retained at site or
electronically accessible

16.3 types of PAM - ANSWER ✔ dry/powder polyacrylamides
liquid polyacrylamides
solid/block polyacrylamides

17.Sediment control BMP's - ANSWER ✔ sediment tube ditch check
stabilized construction entrance
filter fabric inlet protection
block and gravel inlet protection
hardware fabric and stone inlet protection
pre-fabricated inlet protection

18.water surface withdrawal - ANSWER ✔ when discharging from sediment
basins, utilize outlet structures that only withdraw water from near the
waters surface within the basin, unless infeasible

19.what are the additional requirements for sediment basins - ANSWER ✔
surface water withdrawal ( skimmers or stop log risers)

Clean out stake ( 1/2 of sediment storage volume)

Public safety addressed, (as applicable)

,safety fences and signs, vector control(mosquitoes)

sediment forebays (as applicable)

Porous baffles (as applicable)
3 row minimum/ may NOT use silt fence

20.Sediment basin - ANSWER ✔ This sediment control BMP is a structure
designed to capture sediment from storm water runoff before it leaves
construction site. Basin de-watering is achieved through riser and pipe
leading to outlet on downstream side of embankment. NOTE: Near surface
withdrawal required in current CGP.

21.Installation of sediment basins - ANSWER ✔ This sediment control BMP
should be constructed before any grading takes place within drainage area.
This BMP with earthen embankments should be outfitted with de-watering
pipe and riser set just above sediment removal cutoff level. Cleanout stake
must be installed showing 1/2 sediment storage volume.

22.Sediment dam - ANSWER ✔ aka Trap. This sediment control BMP is
formed by excavating or placing earthen embankment across drainage swale.
An outlet or spillway is constructed using No. 5 washed stone and Class B
riprap aggregate.

23.Installation of sediment dam - ANSWER ✔ This sediment control BMP
specifications: 1. Upstream side of outlet should be lined with uniform 6-
inch thick layer of No. 5 stone. 2. Allow stone to extend downstream past
toe of embankment. 3. Mark sediment cleanout level of dam with stake at
1/2 sediment storage volume. 4. All areas of sediment dam should be seeded
except for bottom of basin.

24.Filter fabric inlet protection is the most appropriate BMP of choice in
situations where the flow rate is:

a. High (> 0.5 cfs)
b. Medium (~ 0.5 cfs)
c. Low (< 0.5 cfs)
d. Frequent - ANSWER ✔ c. Low (< 0.5 cfs)

, 25.Which of the following would not file a Notice of Intent (NOI) prior to any
land disturbing activities?

a. Secondary Permittee
b. Utility Provider
c. Compliance Inspector
d. Primary Permittee - ANSWER ✔ c. Compliance Inspector

26.Final site stabilization is achieved when percent vegetative cover on all
disturbed areas is at least the following:

a. 65%
b. 70%
c. 80%
d. 90% - ANSWER ✔ b. 70%

27.The sediment control structure in the center right side of the photo above is
a:

a. Rock-filter fabric inlet
b. Rock construction entrance
c. Rock ditch check
d. Rock spillway for a sediment trap - ANSWER ✔ d. Rock spillway
for a sediment trap

28.Consider the following situation: You observe bulldozer tracks with dozer
traveling parallel to the contour. The statement that you would use in an
inspection report about the situation shown is most nearly.

a. The bulldozer tracks indicate that the tracking was done in the
incorrect direction.
b. The bulldozer tracks indicate that the tracking was done in the correct
direction.
c. The situation is an improper application of tracking and should be
replaced immediately with sod.
d. ECB would not be appropriate on the site because the slope is too flat.
- ANSWER ✔ a. The bulldozer tracks indicate that the tracking was
done in the incorrect direction.

Written for

Institution
CEPSCI
Course
CEPSCI

Document information

Uploaded on
May 27, 2026
Number of pages
35
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$14.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ProfBenjamin Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
684
Member since
1 year
Number of followers
16
Documents
3932
Last sold
7 hours ago
EXCELLENT ACHIEVERS LIBRARY

As a professional tutor, I provide exceptional assistance with homework, quizzes, and exams across various subjects, including Psychology, Nursing, Biological Sciences, Business, Engineering, Human Resource Management, and Mathematics. I am dedicated to offering high-quality support and ensuring that all work meets scholarly standards. To enhance the effectiveness of our services, I work with a team of experienced tutors to create comprehensive and effective revision materials. Together, we are committed to helping students achieve excellent grades through our collaborative efforts and expertise.

Read more Read less
3.8

138 reviews

5
62
4
18
3
35
2
11
1
12

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions