The purpose of the Deploy All Resources Action is to instruct all generating resources to be on line and
at full output _________ - (answer)immediately upon receipt of dispatch instruction
A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. Generation Operators
should: - (answer)Ensure all unit voltage regulators are in service
PJM can issue the Deploy All Resources Action for________ - (answer)the entire RTO, specific Control
Zones or a subset of a Control Zone if transmission limitations exist
Under the National Terrorism Advisory System (NTAS) there are 2 types of alerts: Elevated Threat Alert
and __________. - (answer)Imminent Threat Alert
A Geomagnetic Disturbance Warning is issued by PJM when the NOAA has issued a warning or an alert
for a potential geo-magnetic storm of severity _______ or greater. - (answer)K7
The Generating Capacity reported on a Supplementary Status Report (SSR) includes which of the
following? (Select 2) - (answer)Capacity from offline Hydro and CT units that can be synchronized within
10 minutes.
Total Capacity from online Generation.
What is the requested response time for members to reply to a request for SSR data? - (answer)10
Minutes
If a PJM Member has received reports of a terrorism or sabotage threat to their facilities, they would
notify whom at PJM (in addition to NERC and the DOE) to share this information? - (answer)The PJM
Shift Supervisor
What is the purpose of a capacity emergency warning? (Select 2) - (answer)To keep Members informed
of actual capacity shortages or contingencies that may jeopardize reliability during real time operations.
To ask Members to take specific actions in order to provide relief to the PJM system
, PJM Generator Exam Questions with 100% Correct Answers | Verified ||
ACTUAL EXAM 2026 TEST!! Graded A+ | 2025|2026 EXAM UPDATE
PJM has issued a Minimum Generation Alert. Your current generation output is 200 MW. The Economic
Minimum is 150 MW and Emergency Minimum is 125 MW. How much ERG should be reported for this
unit? - (answer)25 MW
A Manual Load Dump Warning will be issued when: - (answer)Primary Reserve is less than the largest
generating unit or the loss of a transmission facility jeopardizes reliability after all possible measures
have been taken to increase reserves
Actions in a Low Voltage Alert include: (Select 2) - (answer)Request a Reactive Reserve Check
Review transmission and generation outages
Which entities can cancel generator reactive capability tests prior to or during the testing process?
(Select 2) - (answer)PJM and the affected TO
With whom does PJM share the results of generation reactive capability tests? - (answer)The affected
TO
How does the Generation Owner/Operator inform PJM and the TO of scheduled AVR or PSS outages? -
(answer)eDART
Why does PJM require an additional notification of Unit testing 30 minutes prior to the GO/MOC
performing the reactive capability test? - (answer)To allow PJM and TOs to make adjustments to system
voltages prior to the test
For real-time changes in Reactive Capability, The GO/MOC should submit an updated D-curve via eDART
and ____________. - (answer)Notify PJM and the respective TO via phone
ACTUAL EXAM 2026 TEST!! Graded A+ | 2025|2026 EXAM UPDATE
The purpose of the Deploy All Resources Action is to instruct all generating resources to be on line and
at full output _________ - (answer)immediately upon receipt of dispatch instruction
A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. Generation Operators
should: - (answer)Ensure all unit voltage regulators are in service
PJM can issue the Deploy All Resources Action for________ - (answer)the entire RTO, specific Control
Zones or a subset of a Control Zone if transmission limitations exist
Under the National Terrorism Advisory System (NTAS) there are 2 types of alerts: Elevated Threat Alert
and __________. - (answer)Imminent Threat Alert
A Geomagnetic Disturbance Warning is issued by PJM when the NOAA has issued a warning or an alert
for a potential geo-magnetic storm of severity _______ or greater. - (answer)K7
The Generating Capacity reported on a Supplementary Status Report (SSR) includes which of the
following? (Select 2) - (answer)Capacity from offline Hydro and CT units that can be synchronized within
10 minutes.
Total Capacity from online Generation.
What is the requested response time for members to reply to a request for SSR data? - (answer)10
Minutes
If a PJM Member has received reports of a terrorism or sabotage threat to their facilities, they would
notify whom at PJM (in addition to NERC and the DOE) to share this information? - (answer)The PJM
Shift Supervisor
What is the purpose of a capacity emergency warning? (Select 2) - (answer)To keep Members informed
of actual capacity shortages or contingencies that may jeopardize reliability during real time operations.
To ask Members to take specific actions in order to provide relief to the PJM system
, PJM Generator Exam Questions with 100% Correct Answers | Verified ||
ACTUAL EXAM 2026 TEST!! Graded A+ | 2025|2026 EXAM UPDATE
PJM has issued a Minimum Generation Alert. Your current generation output is 200 MW. The Economic
Minimum is 150 MW and Emergency Minimum is 125 MW. How much ERG should be reported for this
unit? - (answer)25 MW
A Manual Load Dump Warning will be issued when: - (answer)Primary Reserve is less than the largest
generating unit or the loss of a transmission facility jeopardizes reliability after all possible measures
have been taken to increase reserves
Actions in a Low Voltage Alert include: (Select 2) - (answer)Request a Reactive Reserve Check
Review transmission and generation outages
Which entities can cancel generator reactive capability tests prior to or during the testing process?
(Select 2) - (answer)PJM and the affected TO
With whom does PJM share the results of generation reactive capability tests? - (answer)The affected
TO
How does the Generation Owner/Operator inform PJM and the TO of scheduled AVR or PSS outages? -
(answer)eDART
Why does PJM require an additional notification of Unit testing 30 minutes prior to the GO/MOC
performing the reactive capability test? - (answer)To allow PJM and TOs to make adjustments to system
voltages prior to the test
For real-time changes in Reactive Capability, The GO/MOC should submit an updated D-curve via eDART
and ____________. - (answer)Notify PJM and the respective TO via phone