Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

ConstruCtion ManageMent Final exaM study guide Questions and CorreCt ansWers (veriFied) | latest uPdate 2026/2027 | graded a+ | Brand neW | 100% guaranteed Pass

Rating
-
Sold
-
Pages
12
Grade
A+
Uploaded on
20-05-2026
Written in
2025/2026

ConstruCtion ManageMent Final exaM study guide Questions and CorreCt ansWers (veriFied) | latest uPdate 2026/2027 | graded a+ | Brand neW | 100% guaranteed Pass

Institution
ConstruCtion ManageMent
Course
ConstruCtion ManageMent

Content preview

ConstruCtion ManageMent Final exaM study guide
Questions and CorreCt ansWers (veriFied) | latest
uPdate 2026/2027 | graded a+ | Brand neW | 100%
guaranteed Pass



The following are the challenges facing the construction industry today, except -
ANSWER-decreasing demand in sustainability requirements


the parameters define the overall extent of work to be included in a construction
contract. - ANSWER-scope of project


a supplemental drawing to the plans and specifications that details fabrication method,
materials, and models of a product or installation associated with the project. -
ANSWER-shop drawings


it is a process of awarding a contract to subcontractors and issuing a purchase order
for materials and equipment. - ANSWER-buy out


a request made by the owner to add or subtract features to the scope of the project
resulting in changes to the contract - ANSWER-change order


a daily amount of money paid by the contractor to the owner for each day that the
project fails to meet the completion date specified in the contract - ANSWER-liquidated
damage


a change or addition to the contract documents issued after the documents have been
released but before the bids are due - ANSWER-addenda


a contract document set consists of - ANSWER-an agreement, construction drawings,
specifications, addenda, general and supplementary condition

, the shop drawings are prepared by the - ANSWER-architect


in the traditional project delivery method for buildings, the day-to-day supervision of the
construction is generally the responsibility of the - ANSWER-general contractor


what is the first known recorded building code that outlines the roles and duties of the
master builder - ANSWER-code of hammurabi


in the construction management (CM) method of project delivery, there is normally no
general contractor - ANSWER-true


in the construction management at risk (CMAR) method of project delivery, the
construction manager - ANSWER-manages the project's construction during the
construction phase


what project delivery method in which only one firm is contracted for both design and
construction of the project - ANSWER-design-build


what delivery method is best used if highly technical in nature of the project that
requires good communication and coordination need to occur between designers and
builder? - ANSWER-Design-build


what delivery method in which there is no or limited input from contractors and
subcontractors during the design phase? - ANSWER-Design-Bid-Build


Turnkey method is a variation of what delivery method when it also involves arranging
for land and financing of the project? - ANSWER-Design-Build


what delivery method in which it is hard to get real up-front fixed price, or price may not
be known until it is actually built? - ANSWER-design-build


what delivery method in which the owner assumes full responsibility on all liability risk
during construction stage? - ANSWER-CM

Written for

Institution
ConstruCtion ManageMent
Course
ConstruCtion ManageMent

Document information

Uploaded on
May 20, 2026
Number of pages
12
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$17.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DoctorDee Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
32
Member since
2 year
Number of followers
7
Documents
5120
Last sold
1 week ago
Hi wayne1111

3.5

6 reviews

5
3
4
0
3
1
2
1
1
1

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions