Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 2 pages
Exam (elaborations)

CECS 343 MIDTERM 1 QUESTIONS AND ANSWERS

Document preview thumbnail
Preview 1 out of 2 pages

CECS 343 MIDTERM 1 QUESTIONS AND ANSWERS

Content preview

CECS 343 MIDTERM 1 QUESTIONS AND ANSWERS


5 generic software engineering framework activities - Answers - communication,
planning, modeling, construction, deployment

Software Engineering - Answers - application of a systematic, disciplined, quantifiable
approach to the development, operation, and maintenance of software

Iterative Model - Answers - A useful approach when a customer cannot define
requirements clearly

T/F: In traditional software requirements gathering, interviewing stakeholders is the
primary technique used. - Answers - True

Process Flow Types - Answers - Evolutionary flow, iterative process flow, linear process
flow, parallel process flow

T/F: Typically, a use case may have multiple success and failure scenarios. - Answers -
True

T/F: All use case actors must be human. - Answers - True

T/F: The unified process, sometimes called the Rational Unified Process, is an agile
process closely aligned with the Unified Modeling Language (UML). - Answers - True

Flaws of the Waterfall Process model - Answers - A "design gap" between analysis
model and design model. No working functionality until the entire system is complete.
Little to no consideration for changes in requirements.

Use Case - Answers - A list of actions or event steps, typically defining the interactions
between a role and a system to achieve a goal.

use case diagram - Answers - the UML model used to graphically show use cases and
their relationships to actors

Umbrella Activities - Answers - software project management, formal technical reviews,
software quality assurance, software configuration management, work product
preparation & production, reusability management, measurement, risk management

T/F: The V process model is essentially the "waterfall" process model with testing tied to
each major activity. - Answers - True

T/F: UP phases have no overlaps. - Answers - False. There are many overlaps.

Document information

Uploaded on
May 20, 2026
Number of pages
2
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$9.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Greaterheights
4.0
(222)
Sold
1158
Followers
882
Items
20473
Last sold
6 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions