Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

National Commission for the Certification of Crane Operators Signalperson Certification (UA Crane Signal Person) Exam Questions and Answers

Rating
-
Sold
-
Pages
16
Grade
A+
Uploaded on
18-05-2026
Written in
2025/2026

National Commission for the Certification of Crane Operators Signalperson Certification (UA Crane Signal Person) Exam Questions and Answers

Institution
Advanced Education
Course
Advanced education

Content preview

National Commission for the Certification of
Crane Operators Signalperson Certification
(UA Crane Signal Person) Exam Questions
and Answers

Before beginning operations using voice signals, the lift director, signal person
and _______________. must contact each other and agree upon the task and
voice signals to be used. - ANSWER>>crane operator

When performing voice signals, they must be clear, consistent and ___________
to allow the operator to understand the signals given. - ANSWER>>audible

If the operator cannot hear or understand the signals given, they are required to
________________. - ANSWER>>stop

If the operator sees something dangerous, they are required to
_______________. - ANSWER>>stop and communicate with the signal person

The operator is required to follow a stop or emergency stop from
___________________. - ANSWER>>anyone

The language used during voice communications must be ___________________.
- ANSWER>>understood by all involved in the operation

When using voice signals, all directions must be given from the
__________________. - ANSWER>>operator's perspective

,Before starting operations with electronic devices, they shall be tested to ensure
that signals are __________________. - ANSWER>>clear
reliable
on a dedicated channel

An exception to a dedicated channel includes _______________________. -
ANSWER>>the lift has more than one crane involved
the lift has more than one signal person involved
a dedicated spotter is being used

The crane operator's reception of voice signals must be ______________. -
ANSWER>>hands free

What is the first element in giving a voice signal? - ANSWER>>function and
direction

What is the second element in giving a voice signal - ANSWER>>distance and/or
speed

What is the third element in giving a voice signal - ANSWER>>function stop

Voice signals are required to be ____________________ throughout the duration
of requested movement. - ANSWER>>maintained

Distances used in the second element should be ______________________. -
ANSWER>>given in decreasing numbers

If a load movement has been planned, do not deviate from that plan unless the
__________________ is (are) consulted. - ANSWER>>lift director and crane
operator

If using an audible signal to direct crane movements, how is "STOP" signaled? -
ANSWER>>1 short sound

, If using an audible signal to direct crane movements, how is "Drive Forward"
signaled? - ANSWER>>two short sounds

If using an audible signal to direct crane movements, how is "Drive Backwards"
signaled? - ANSWER>>3 short sounds

The approval of a non standard signal must be understood and approved by the
operator, signal person, and ______________. - ANSWER>>the lift director

If the safe working radius of the crane is exceeded, the crane may _____________
- ANSWER>>tip over and have structural failure

The horizontal distance from the rotation pin of the crane to the center of gravity
of the load is called the __________________. - ANSWER>>Radius

What are 4 actions that a crane may take that can increase the radius of the
crane? - ANSWER>>Extend boom
Lower boom
Swing fast
hoist with boom deflection

The angle of the boom is always measured from ________________ to crane
boom. - ANSWER>>the horizontal

Crane booms are best designed to resist ______________________, while lower
boom angles can cause them to bend. - ANSWER>>compression

The temporary bending of a boom while under a rated load is called
________________. - ANSWER>>deflection

The unintentional movement of the load after the crane has stopped movement
is called ________________. - ANSWER>>drift

Written for

Institution
Advanced education
Course
Advanced education

Document information

Uploaded on
May 18, 2026
Number of pages
16
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$16.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
academictutormaster

Get to know the seller

Seller avatar
academictutormaster Johns Hopkins University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1
Member since
1 year
Number of followers
1
Documents
1685
Last sold
11 months ago
higher school education is hard...Here are some tools to help ♡

Hello scholars! I'm here to make higher level education a little bit EASIER. Good luck with studying! Appreciate you all and wish you the best of luck going forward

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions