Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

North American Electric Reliability Corporation Test Questions and Answers Study Guide

Rating
-
Sold
-
Pages
33
Grade
A+
Uploaded on
18-05-2026
Written in
2025/2026

North American Electric Reliability Corporation Test Questions and Answers Study Guide

Institution
Advanced Education
Course
Advanced education

Content preview

North American Electric Reliability
Corporation Test Questions and
Answers Study Guide




Operating reserve may be provided by which of the following?
A. LTCs
B. Capacitor banks
C. Voltage regulators
D. Interruptible loads - ANSWER>>D. Interruptible loads

Which of the following is the responsibility of a reserve sharing group (RSG)?
A. Complying with DCS as if it was a single control area
B. Proving regulation service for neighboring RSGs
C. Ensuring each control area in the group maintains 50% blackstart capability
D. Complying with the control performance standards as if it was a single control
area - ANSWER>>A. Complying with DCS as if it was a single control area

,Generation is not sufficient to meet load, the control area is importing heavily,
and voltage is decaying, which of the following actions should be taken by the
operator?
A. Shed load
B. Correct schedule deviation
C. Use the Interconnection Hotline
D. Schedule interchange transaction - ANSWER>>A. Shed load

What measures power flow data between control areas?
A. OASIS
B. Interchange
C. Transactions
D. Tie-Line metering - ANSWER>>D. Tie-Line metering

Transmission line removal as a voltage control can be used if:
A. Loop flow remains high
B. Reactive equipment is available
C. Reliability stays at acceptable levels
D. Synchronous condensers are off the line - ANSWER>>C. Reliability stays at
acceptable levels

Control Area A is generating and sending Control Area B a schedule. Both control
areas should verify all of the following EXCEPT:
A. Magnitude (MW)
B. Ramp rate
C. Price
D. Start/stop times - ANSWER>>C. Price

The AGC control mode that is normally used for system operation is:
A. Flat Tie Mode
B. Flat Frequency Mode
C. Frequency Bias Mode
D. Tie Line Bias Mode - ANSWER>>D. Tie Line Bias Mode

,There has been a wide-area disturbance. The transfers through the system have
increased and there is a possibility that loss of one major tie line would cause
corresponding loading and voltage deviations. Having system resources available,
the security coordinator should:
A. Increase generation to reduce flows across the ties
B. Implement schedule changes across the hour
C. Implement a voltage reduction plan
D. Advise the supervisor - ANSWER>>A. Increase generation to reduce flows
across the ties

When referring to transmission lines of an interconnected network, neighboring
systems should use:
A. Own line identifiers and ratings
B. NERC line identifiers and ratings
C. Region line identifiers and ratings
D. Uniform (common) line identifiers and ratings - ANSWER>>D. Uniform
(common) line identifiers and ratings

To what level should a control area maintain its own reactive reserves?
A. 105% voltage level
B. 95% voltage level
C. First contingency conditions
D. Second contingency conditions - ANSWER>>C. First contingency conditions

Which load shedding step should be implemented first (per Policy 6B)?
A. Manual
B. Underfrequency
C. Rate of voltage decay
D. Rate of frequency decay - ANSWER>>A. Manual

Between sending, receiving, and intermediary control areas, what is the minimum
information pertaining to an interchange schedule that must be confirmed?

, 1. The scheduling path & magnitude of the transaction
2. The Start/stop times, ramp times, and duration
3. Price of energy
4. Loss accounting including MVAR at points of receipt and delivery
A. 1 and 2
B. 1 and 4
C. 2 and 3
D. 3 and 4 - ANSWER>>A. 1 and 2

Control areas shall NOT operate to cause any other system to violate established
operating reliability criteria from changes made to:
A. Interchange schedules
B. Capacitor banks
C. Reactors
D. LTCs - ANSWER>>A. Interchange schedules

Per Policy 4, 4A, In order to predict the system's near term load pattern, a system
operator must have information including weather forecasts and:
A. Sufficient metering
B. Past load patterns
C. Projected load patterns
D. Generator overhaul schedules - ANSWER>>B. Past load patterns

All of the following electric system security data are to be updated at least every
10 minutes EXCEPT:
A. Operating reserve
B. Control area demand
C. Area control area frequency
D. Forecast changes on equipment status - ANSWER>>D. Forecast changes on
equipment status

Security Coordinator A requests Reliability Coordinator B to curtail a transaction
from B to C. The Reliability Coordinator B should do which of the following:

Written for

Institution
Advanced education
Course
Advanced education

Document information

Uploaded on
May 18, 2026
Number of pages
33
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$16.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
academictutormaster

Get to know the seller

Seller avatar
academictutormaster Johns Hopkins University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1
Member since
1 year
Number of followers
1
Documents
1685
Last sold
11 months ago
higher school education is hard...Here are some tools to help ♡

Hello scholars! I'm here to make higher level education a little bit EASIER. Good luck with studying! Appreciate you all and wish you the best of luck going forward

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions