◉ Number of open valves on the clean air separator:
Answer: One
◉ You must be CERTIFIED by Healy to re-connect a Healy
breakaway, True or False?
Answer: False
◉ The type of pressure gauge is recommended to test Healy Vac
Answer: SYSA gauge measuring 0-100 WC
◉ On new construction, after July 1, 2004, Can you install an in-
ground Spill Bucket?
Answer: YES-When Piping is monitored and with VAC
◉ According to Executive Order 201 - Healy P/V Valve should be
torqued at
Answer: 20-50 ft-lbs
,◉ For a fire to burn, these (3) three primary elements must exist:
Answer: Fuel, Oxygen, Ignition Source
◉ When working with Electrical - Lock Out Tag Out procedures are
under these guidelines.
Answer: CAL-OSHA
◉ Organization that certifies vapor recovery systems.
Answer: CARB or ARB
◉ According to RP 500, a level II technician may NOT inspect this
part.
Answer: Replace VP 1000 Healy Pump
◉ where hanging hardware repairs must be tracked.
Answer: GDF maintenance log
◉ approved sealant when assembling a Phil-Tite Drop Tube.
Answer: JB-Kwik
◉ Material direct bury OPW container sleeve shall be made of.
Answer: Stainless steel
, ◉ What P/V vent cap shall be tightened to.
Answer: 20-50 ft lbs
◉ From dispenser to manifold - 2" diameter vapor piping ( 2" ID)
and From manifold to tank - 3" diameter vapor piping (3" ID)
Answer: Vapor piping
◉ What is the maximum run for vapor piping?
Answer: No maximum run
◉ How you know a nozzle spout is bad.
Answer: 'BAD O-rinqs
◉ According to PEI RP 300, on a balance Stage II vapor recovery
system nozzle, Vapors typically flow in what direction of the coaxial
hose?
Answer: The outside pathway
◉ What is the maximum allowable number of P/V caps allowed on a
UST fuel system?
Answer: One
SCRIPT 2026 VERIFIED ANSWERS
COMPREHENSIVE REVIEW
◉ Number of open valves on the clean air separator:
Answer: One
◉ You must be CERTIFIED by Healy to re-connect a Healy
breakaway, True or False?
Answer: False
◉ The type of pressure gauge is recommended to test Healy Vac
Answer: SYSA gauge measuring 0-100 WC
◉ On new construction, after July 1, 2004, Can you install an in-
ground Spill Bucket?
Answer: YES-When Piping is monitored and with VAC
◉ According to Executive Order 201 - Healy P/V Valve should be
torqued at
Answer: 20-50 ft-lbs
,◉ For a fire to burn, these (3) three primary elements must exist:
Answer: Fuel, Oxygen, Ignition Source
◉ When working with Electrical - Lock Out Tag Out procedures are
under these guidelines.
Answer: CAL-OSHA
◉ Organization that certifies vapor recovery systems.
Answer: CARB or ARB
◉ According to RP 500, a level II technician may NOT inspect this
part.
Answer: Replace VP 1000 Healy Pump
◉ where hanging hardware repairs must be tracked.
Answer: GDF maintenance log
◉ approved sealant when assembling a Phil-Tite Drop Tube.
Answer: JB-Kwik
◉ Material direct bury OPW container sleeve shall be made of.
Answer: Stainless steel
, ◉ What P/V vent cap shall be tightened to.
Answer: 20-50 ft lbs
◉ From dispenser to manifold - 2" diameter vapor piping ( 2" ID)
and From manifold to tank - 3" diameter vapor piping (3" ID)
Answer: Vapor piping
◉ What is the maximum run for vapor piping?
Answer: No maximum run
◉ How you know a nozzle spout is bad.
Answer: 'BAD O-rinqs
◉ According to PEI RP 300, on a balance Stage II vapor recovery
system nozzle, Vapors typically flow in what direction of the coaxial
hose?
Answer: The outside pathway
◉ What is the maximum allowable number of P/V caps allowed on a
UST fuel system?
Answer: One