Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Traffic Supervisor Exam Questions with verified Answers For 2026 Graded To Pass !!

Rating
-
Sold
-
Pages
58
Grade
A+
Uploaded on
17-05-2026
Written in
2025/2026

Traffic Supervisor Exam Questions with verified Answers For 2026 Graded To Pass !!

Institution
Course

Content preview

Traffic Supervisor Exam Questions with verified Answers For
2026 Graded To Pass !!!
When unacceptable Traffic Control Devices are found in the work zone, they must be removed
and replaced within ____ hours of notification
A. 8
B. 4
C. 6
D. 12
12
If less than 90% of the pixels per character are operating in the PCMS, it is considered a
marginal quality standard.
A. True
B. False
False
What is the minimum merging taper length for one 12' lane closure on 55 MPH Multi-Lane
Divided Highway?
A. 660
B. 550
C. 1020
D. 700
660
Spalls greater than ___ on temporary barrier is considered unacceptable.
A. 0.5"
B. 1"
C. 1.5"
D. 6"
1.5"
How many drums are needed in a 1,200 FT Tangent Section on a 65 MPH Highway?
A. 25
B. 10
C. 16

Page 1 of 58

,D. 40
10
While adjusting Sign spacing to avoid conflict with existing signs, ____ is the minimum spacing
to existing signs for speeds of 45 MPH or less.
A. 100'
B. 200'
C. 300'
D. 400'
200'
A minimum of __ drums shall be used to close upstream shoulder.
A. 5
B. 8
C. 10
D. We don't need to close the shoulder while we are closing the lane.
5




When cones are substituted for drums at nighttime closer, what is the maximum cone spacing?
A. 20'
B. 30'
C. 40'
D. 50'
40'
What type of flashing warning lights are required when there is a nighttime lane closer?
A. ROAD WORK AHEAD
B. LANE CLOSED AHEAD
C. A & B
D. NONE OF THE ABOVE
ROAD WORK AHEAD
&


Page 2 of 58

,LANE CLOSED AHEAD
If there is a lane closure of greater than three days, what is required?
A. Work zone dotted lines, 4' in length separated by 10' gaps, shall be provided to identify the
merge.
B. The appropriate color work zone edge lines shall be applied along the taper and tangent
sections.
C. All the above
D. None of the above
The appropriate color work zone edge lines shall be applied along the taper and tangent
sections.
Work zone pavement marking that conflict with final traffic lanes shall be temporary paint.
A. True
B. False
False
What are the extra advance warning signs?
A. Lane Close Ahead
B. Watch for Stopped Traffic
C. Road Work Ahead
D. All the above
Lane Change Ahead
&
Watch for Stopped Traffic
&
Road Work Ahead
Is the advisory speed plaque used in all traffic zones?
A. True
B. False
False
When the approach speed limit is 40 mph or less, 36" warning signs may be used.
A. True
B. False

Page 3 of 58

, True
Road Work Ahead signs shall be provided on entrance ramps or roadways entering the work
limits.
A. True
B. False
True
End Road Work signs are only required for lane closures of more than ______ day.
A. 1
B. 2
C. 3
D4
1
Is a shadow vehicle used in all traffic zones?
A. True
B. False
False
The shadow vehicle is occupied whenever workers are in the work area.
A. True
B. False
False
What class one light is the shadow vehicle equipped with?
A. Flashing Yellow Light
B. Oscillating Yellow Light
C. Yellow Strobe Light
D. All of the above
All of the above
When may cones be substituted for drums?
A. Daytime traffic control minimum height 18"
B. Daytime traffic control minimum height 28"
C. Daytime traffic control minimum height 36"


Page 4 of 58

Written for

Course

Document information

Uploaded on
May 17, 2026
Number of pages
58
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$12.00
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
smithclaggercole

Get to know the seller

Seller avatar
smithclaggercole WINSCOIN
Follow You need to be logged in order to follow users or courses
Sold
2
Member since
8 months
Number of followers
0
Documents
136
Last sold
3 months ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions