COURSE - DAY 2 COMPLETE
QUESTIONS AND CORRECT DETAILED
ANSWERS (VERIFIED ANSWERS)
|ALREADY GRADED A+|
when is the decontamination unit set up? - CORRECT ANSWER ✔✔- before
preparing the work area
what do you need additionally for remote or distant decontamination units? -
CORRECT ANSWER ✔✔- -2 disposable suits, remove one and put another on
when exiting work area.
-extra airlock for work area and equipment room or decon unit
what must stay up until final clearance? - CORRECT ANSWER ✔✔- -critical
barriers
-decon unit
-negative air filtration unit (microtrap)
work area must have: - CORRECT ANSWER ✔✔- -warning signs
-"lock out and tag out"
-GFCI
-Seal all HVAC openings with 2 layers independently
-when the opening is more than 32sqft we need to put up a solid barrier
1
, live electricity needs how many layers of plastic? - CORRECT ANSWER ✔✔- 3
layers of plastic
how to plasticize walls and floors? - CORRECT ANSWER ✔✔- 2 layers of plastic
alternatively with 2" between wall and ceiling or floor depending on which is being
worked on
how far should seams be between plastic layers for NYS and NYC? - CORRECT
ANSWER ✔✔- -NYS = 6ft.
-NYC = 6in.
safety hazard information: - CORRECT ANSWER ✔✔- -SDS (safety data sheet)
-chemical information
- basic information can be found on chemical label
-MSDS (material data safety sheet)
fire extinguisher types - CORRECT ANSWER ✔✔- Type A: paper, wood, rubber
Type B: flammable liquids (gas)
Type C: anything electrically energized
Type D: metals
Type K: animal / vege oils
heat related disorders: - CORRECT ANSWER ✔✔- -heat exhaustion
-heat stroke