Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

ASBESTOS PROJECT MONITOR COURSE - DAY 2 COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+|

Document preview thumbnail
Preview 2 out of 8 pages

Pass your Asbestos Project Monitor certification exam with this Day 2 complete Q&A study guide featuring verified answers—already graded A+. Designed for asbestos project monitors, environmental health and safety professionals, and abatement supervisors, this resource covers all essential topics including: decontamination unit setup (before preparing work area), remote decon requirements (extra airlock, two disposable suits), critical barriers and negative air filtration, work area requirements (warning signs, lockout/tagout, GFCI), sealing HVAC openings with 2 independent layers, 3 layers of plastic for live electricity, plasticizing walls and floors (2 layers alternating with 2" gap), seam distance requirements (NYS 6ft vs NYC 6in), safety data sheets (SDS/MSDS), fire extinguisher types (A, B, C, D, K), heat exhaustion vs. heat stroke symptoms and prevention, carbon monoxide poisoning causes (oil compressors, kerosene heaters, open flame, combustion engines), clean room size (32 sq ft per 6 workers or 24 sq ft for ≤3 workers), airlock minimum width (3ft), shower room drain filter (5 micron), 1 shower head per 6 workers, plastic characteristics (6 mil poly, fire-retardant; floor: 2 layers reinforced), clean room procedure (logbook, leave license), donning PPE order (gown, respirator, goggles, gloves), doffing order (HEPA vacuum, wash tools, remove coverall, shower with respirator on, clean respirator), separate waste decon for large projects (≥1000 sq ft or 100 linear ft in NYS, NYC 6in threshold), scaffold regulations (harness above 10ft, height ≤4x width), asbestos removal steps (wet, remove, clean substrate, final cleaning 3 times), NYS final cleaning steps (HEPA vacuum/wet wipe, encapsulate, wait 12h, remove 2nd plastic, HEPA/wet wipe, wait 12h, visual inspection, final air sampling), NYC final cleaning (12h, 4h, 1h waits), NYS final clearance (0.01 f/cc or background), decon bag labeling (building owner name, location of renovation/demolition), pipe insulation removal (glove bag, 2 workers with half-face APR, smoke test, prohibited above 150°F), NESHAP (prohibits visible asbestos emissions), AHERA (K-12 schools inspect every 3 years), ASHARA (colleges/universities asbestos plan), fees charged by NYS and NYC, ACP5 (asbestos assessment, not a project) vs ACP7 (asbestos project 10 sq ft), notification times (EPA/NYS 10 days for large projects, NYC 7 days for large and small). Perfect for Asbestos Project Monitor course exam, NYSDOL certification, and NYC DEP asbestos compliance.

Content preview

ASBESTOS PROJECT MONITOR
COURSE - DAY 2 COMPLETE
QUESTIONS AND CORRECT DETAILED
ANSWERS (VERIFIED ANSWERS)
|ALREADY GRADED A+|


when is the decontamination unit set up? - CORRECT ANSWER ✔✔- before
preparing the work area


what do you need additionally for remote or distant decontamination units? -
CORRECT ANSWER ✔✔- -2 disposable suits, remove one and put another on
when exiting work area.
-extra airlock for work area and equipment room or decon unit


what must stay up until final clearance? - CORRECT ANSWER ✔✔- -critical
barriers
-decon unit
-negative air filtration unit (microtrap)


work area must have: - CORRECT ANSWER ✔✔- -warning signs
-"lock out and tag out"
-GFCI
-Seal all HVAC openings with 2 layers independently
-when the opening is more than 32sqft we need to put up a solid barrier

1

, live electricity needs how many layers of plastic? - CORRECT ANSWER ✔✔- 3
layers of plastic


how to plasticize walls and floors? - CORRECT ANSWER ✔✔- 2 layers of plastic
alternatively with 2" between wall and ceiling or floor depending on which is being
worked on


how far should seams be between plastic layers for NYS and NYC? - CORRECT
ANSWER ✔✔- -NYS = 6ft.
-NYC = 6in.


safety hazard information: - CORRECT ANSWER ✔✔- -SDS (safety data sheet)
-chemical information
- basic information can be found on chemical label
-MSDS (material data safety sheet)


fire extinguisher types - CORRECT ANSWER ✔✔- Type A: paper, wood, rubber
Type B: flammable liquids (gas)
Type C: anything electrically energized
Type D: metals
Type K: animal / vege oils


heat related disorders: - CORRECT ANSWER ✔✔- -heat exhaustion
-heat stroke



2

Document information

Uploaded on
May 16, 2026
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NurseMitch
4.8
(101)
Sold
56
Followers
3
Items
1225
Last sold
2 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions