QUESTIONS 2026 CONSTRUCTION
SCRIPT SOLVED QUESTIONS
VERIFIED ANSWERS A+
◉ station.
Answer: horizontal distance of 100 ft
◉ plan view.
Answer: horizontal alignment
◉ profile view.
Answer: vertical plane cut through the centerline of the work
◉ cross section view.
Answer: vertical section at right angles to the centerline of the work
◉ stripping.
Answer: removing upper layer of amterial before excavation
◉ in situ.
Answer: natural undisturbed in place soil or rock
, ◉ cohesive material.
Answer: soil having strong interparticle attractive forces
◉ plasticity.
Answer: capability of being molded
◉ shrinkage.
Answer: volume reduction usually occurring when soils or rock are
subjected to moisture or mechanical compaction
◉ swell.
Answer: a volume increase occuring when soils or rocks are excavated
and loosened from the earths crust
◉ five major types of soil.
Answer: gravel, sand, clay, silt, and organic matter
◉ liquid limit.
Answer: the water content at which a soil passes from the plastic to the
liquid state. High LL values are soils with high compressibility
◉ optimum water content.
Answer: amount of water required for a given soil to reach maximum
density