Answers
Conducting an onsite visit when assessing a location for an electric vehicle supply
equipment installation is important because - answerit allows the electrical contractor to
understand the prospective customers needs for an EVSE installation AND it provides
an opportunity for electrical contractor to gather facts and present themselves as a
knowledgeable professional.
Information gathered during a site visit should include... - answerA. Details about the
existing electrical visit.
B. Details on the desired EVSE location.
C. Notes on how the customer intends to use the EVSE installation.
D. All of the above **
A successful meeting with a prospective customer requires the contractor or contractor's
representative to _____ - answerdemonstrate that they are qualified and have the
needed expertise to handle the project, listen to the customer and ask questions, and
look professional.
Incentives available for EVSE installation include which of the following? - answerA.
Rate breaks or other incentives from serving utility.
B. state or federal tax credits
C. tax incentives from the city of municipality.
D. All of the above**
Leadership in energy and Environmental Design (LEED) has ____ certification levels. -
answer4
Installation of EVSE at an existing building is worth as many as ____ LEED points. -
answer15
Installing electric vehicle charging equipment may ____ public perception of a business
- answerimprove
When a business installs charging equipment, the public may sense that the business
supports.... - answersustainability
Determining the appropriate location for EVSE requires the person planning the
installation to consider... - answerHow the customer plans on using the installation.
True or False: Proper location of EVSE may include consideration of ADA guidelines
depending on location. - answerTrue