Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

USCG MK1 EOCT QUESTIONS AND ANSWERS 100% CORRECT

Rating
-
Sold
-
Pages
12
Grade
A+
Uploaded on
12-05-2026
Written in
2025/2026

USCG MK1 EOCT QUESTIONS AND ANSWERS 100% CORRECT What is the reporting interval for the Boat inspection report ? every year A cutter engineering report uses what form? cg4874 Guidelines for reports are taken from what publication? COMDTINST M9000.6 (series Where is the Boat Inspection Report copies sent to? MLC Where is the Cutter Engineering Report copies sent to? MLC The following units are required to maintain a Machinery History File. all cutters 65 feet or longer What length vessels use a Boat Inspection Report? all vessels less than 65 feet Which types of vessels are required to maintain CSMP files? cutters 65 feet and longer What type of message identifies parts required to repair an equipment casualty? CASREP Clear, understandable terms the work to be done in developing or producing the goods to be delivered or services to be performed by a contractor are included in what? Statement of work Which of the following directives prescribes polices and procedures for administering the Coast Guard paperwork management program? COMDTINST M5212.12 (series) What is the reporting interval for the Cutter Engineering Report? Every calendar year ending in Dec A Casualty Report (CASREP) should be submitted for any equipment malfunction or deficiency that cannot be corrected within 48 hours and affects the unit's primary and secondary missions Units shall submit a CASREP as soon as possible, but not later than 24 hours, after the occurrence of a significant casualty which cannot be corrected within 48hrs A deficiency exists in mission essential equipment that causes a minor degradation of any primary mission, or a major degradation or total loss of a secondary mission Casualty Category 2 A deficiency exists in mission essential equipment that causes a major degradation but not the loss of a primary mission. Casualty Category 3 A deficiency exists in mission essential equipment that is worse than casualty category 3, and causes a loss of at least one primary mission. Casualty Category 4 What is the form number for a Shore Station Maintenance Record (SSMR)? CG-4094 What priority code should be used on an SSMR for a shore station maintenance project that has to be completed within a 6-month period? Priority 2 Which manual publishes the complete list of Coast Guard directives and their required distribution? Directives, Publications and Reports Index (DPRI) What Chapter/Section of the DPRI listing identifies the order form to use to request updates, replacements, or new directives? Chapter 1, Section C Where should you log the official changes issued to a directive Record of Changes Page What priority code should you use on an SSMR for a shore station maintenance project that is to be accomplished as part of a normal backlog? priorty 3 The Statement of Work is used to measure _____ performance. contractor What is the form number for submitting an SSMR cg-4094

Show more Read less
Institution
USCG Auxiliary
Course
USCG Auxiliary

Content preview

USCG MK1 EOCT QUESTIONS AND
ANSWERS 100% CORRECT

What is the reporting interval for the Boat inspection report ? - answer every year

A cutter engineering report uses what form? - answercg4874

Guidelines for reports are taken from what publication? – answer COMDTINST
M9000.6 (series

Where is the Boat Inspection Report copies sent to? - answerMLC

Where is the Cutter Engineering Report copies sent to? - answerMLC

The following units are required to maintain a Machinery History File. - answerall cutters
65 feet or longer

What length vessels use a Boat Inspection Report? - answerall vessels less than 65
feet

Which types of vessels are required to maintain CSMP files? - answercutters 65 feet
and longer

What type of message identifies parts required to repair an equipment casualty? -
answerCASREP

Clear, understandable terms the work to be done in developing or producing the goods
to be delivered or services to be performed by a contractor are included in what? -
answerStatement of work

Which of the following directives prescribes polices and procedures for administering
the Coast Guard paperwork management program? - answerCOMDTINST M5212.12
(series)

What is the reporting interval for the Cutter Engineering Report? - answerEvery
calendar year ending in Dec

A Casualty Report (CASREP) should be submitted for any equipment malfunction or
deficiency that cannot be corrected within 48 hours and affects the unit's -
answerprimary and secondary missions

, Units shall submit a CASREP as soon as possible, but not later than 24 hours, after the
occurrence of a significant casualty which cannot be corrected within - answer48hrs

A deficiency exists in mission essential equipment that causes a minor degradation of
any primary mission, or a major degradation or total loss of a secondary mission -
answerCasualty Category 2

A deficiency exists in mission essential equipment that causes a major degradation but
not the loss of a primary mission. - answerCasualty Category 3

A deficiency exists in mission essential equipment that is worse than casualty category
3, and causes a loss of at least one primary mission. - answerCasualty Category 4

What is the form number for a Shore Station Maintenance Record (SSMR)? -
answerCG-4094

What priority code should be used on an SSMR for a shore station maintenance project
that has to be completed within a 6-month period? - answerPriority 2

Which manual publishes the complete list of Coast Guard directives and their required
distribution? - answerDirectives, Publications and Reports Index (DPRI)

What Chapter/Section of the DPRI listing identifies the order form to use to request
updates, replacements, or new directives? - answerChapter 1, Section C

Where should you log the official changes issued to a directive - answerRecord of
Changes Page

What priority code should you use on an SSMR for a shore station maintenance project
that is to be accomplished as part of a normal backlog? - answerpriorty 3

The Statement of Work is used to measure _____ performance. - answercontractor

What is the form number for submitting an SSMR - answercg-4094

What is used to cleaning the tubes in a shell and tube heat exchanger? - answerNylon
brushes

What type of brush is used for cleaning the plates in a plate type heat exchanger? -
answerfiber brush

What are the two types of auxiliary boilers? - answerfier tube and water tube

When cleaning the tube sheet and inside shell of a heat exchanger, use a stiff _____
brush or plastic scraper. - answernon metalic

Written for

Institution
USCG Auxiliary
Course
USCG Auxiliary

Document information

Uploaded on
May 12, 2026
Number of pages
12
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$15.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Thumbnail
Package deal
USCG Auxiliary Exam Bundled
-
24 2026
$ 170.89 More info

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Dreamer252 NBursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
492
Member since
3 year
Number of followers
297
Documents
21489
Last sold
6 days ago

4.0

119 reviews

5
63
4
23
3
18
2
2
1
13

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions