ANSWERS 100% CORRECT
What is the reporting interval for the Boat inspection report ? - answer every year
A cutter engineering report uses what form? - answercg4874
Guidelines for reports are taken from what publication? – answer COMDTINST
M9000.6 (series
Where is the Boat Inspection Report copies sent to? - answerMLC
Where is the Cutter Engineering Report copies sent to? - answerMLC
The following units are required to maintain a Machinery History File. - answerall cutters
65 feet or longer
What length vessels use a Boat Inspection Report? - answerall vessels less than 65
feet
Which types of vessels are required to maintain CSMP files? - answercutters 65 feet
and longer
What type of message identifies parts required to repair an equipment casualty? -
answerCASREP
Clear, understandable terms the work to be done in developing or producing the goods
to be delivered or services to be performed by a contractor are included in what? -
answerStatement of work
Which of the following directives prescribes polices and procedures for administering
the Coast Guard paperwork management program? - answerCOMDTINST M5212.12
(series)
What is the reporting interval for the Cutter Engineering Report? - answerEvery
calendar year ending in Dec
A Casualty Report (CASREP) should be submitted for any equipment malfunction or
deficiency that cannot be corrected within 48 hours and affects the unit's -
answerprimary and secondary missions
, Units shall submit a CASREP as soon as possible, but not later than 24 hours, after the
occurrence of a significant casualty which cannot be corrected within - answer48hrs
A deficiency exists in mission essential equipment that causes a minor degradation of
any primary mission, or a major degradation or total loss of a secondary mission -
answerCasualty Category 2
A deficiency exists in mission essential equipment that causes a major degradation but
not the loss of a primary mission. - answerCasualty Category 3
A deficiency exists in mission essential equipment that is worse than casualty category
3, and causes a loss of at least one primary mission. - answerCasualty Category 4
What is the form number for a Shore Station Maintenance Record (SSMR)? -
answerCG-4094
What priority code should be used on an SSMR for a shore station maintenance project
that has to be completed within a 6-month period? - answerPriority 2
Which manual publishes the complete list of Coast Guard directives and their required
distribution? - answerDirectives, Publications and Reports Index (DPRI)
What Chapter/Section of the DPRI listing identifies the order form to use to request
updates, replacements, or new directives? - answerChapter 1, Section C
Where should you log the official changes issued to a directive - answerRecord of
Changes Page
What priority code should you use on an SSMR for a shore station maintenance project
that is to be accomplished as part of a normal backlog? - answerpriorty 3
The Statement of Work is used to measure _____ performance. - answercontractor
What is the form number for submitting an SSMR - answercg-4094
What is used to cleaning the tubes in a shell and tube heat exchanger? - answerNylon
brushes
What type of brush is used for cleaning the plates in a plate type heat exchanger? -
answerfiber brush
What are the two types of auxiliary boilers? - answerfier tube and water tube
When cleaning the tube sheet and inside shell of a heat exchanger, use a stiff _____
brush or plastic scraper. - answernon metalic