Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 129 pages
Exam (elaborations)

CESSWI Part 2 UPDATED ACTUAL Exam Questions and CORRECT Answers

Document preview thumbnail
Preview 4 out of 129 pages

CESSWI Part 2 UPDATED ACTUAL Exam Questions and CORRECT Answers

Content preview

CESSWI Part 2 UPDATED ACTUAL Exam
Questions and CORRECT Answers

Existing Veg, Desc/Purp - CORRECT A N S W E R ⬛⬛- temp or perm bmp desi to stab soil and
remove sups part from sheet flow runoff.


Existing Veg, Objectives - CORRECT A N S W E R ⬛⬛- 1) Site Plan and Mang
2) Erosi Cont
3) Sedi Cont
4) Post-Cons Mang


Existing Veg, applic - CORRECT A N S W E R ⬛⬛- 1) Areas within site where no const
activity is occur
2) Areas where local, state and fed govt require preservation
3) Areas where existing veg can be utilized for eros, sedi, and storm water quality.



Existing veg: inspection - CORRECT A N S W E R ⬛⬛- 1) Accord to regu timetables
2) erosi and damage veg
3) sufficient moisture to ensure growth
4) veg is well stab
5) adequate cover
6) debris and litter
7) invasive exotics


Existing veg: maint - CORRECT A N S W E R ⬛⬛- 1) only disturb area for construct
2) irrigate dry seasons

3) remove see, and replant if need be

4) replant or rework buffer strips

,5) mow and cut perennial weeds

6) remove all trash and debri

7) treat invasive and noxious species



Sched/Sequ, purp/descrip - CORRECT A N S W E R ⬛⬛- Temp, procedural control that involves
creating a written plan to address neck bmps and sequencing of construct activities to mitigate
the erosive effects of wind,water and construct activities.


Sched/Sequ: object - CORRECT ANSWER⬛⬛- 1) site planning & management
2) erosion control
3) sediment control


Sched/Sequ: applications - CORRECT A N S W E R ⬛⬛- 1) develop timetables for certain
activities, paretic during rainy season


Sched/Sequ: inspect - CORRECT ANSWER⬛⬛- 1) inclusion of sched/seq as a bmp in the
plan
2) ached site activities mirroring ached activites.


Sched/Sequ: maintanence - CORRECT A N S W E R ⬛⬛- 1) modify ached of active when
changes are warranted
2) modify ached of active prior to rainy season to reflect updated bmp info


Hydroseed: Des& purp - CORRECT A N S W E R ⬛⬛- Temp or perm bmp designed to reduce
erosion and runoff by applying mix of seed, fert and stabilizing emulsion.


Hydroseed: object - CORRECT A N S W E R ⬛⬛- 1) erosion control
2) good housekeeping/ materials management
3) post construct management

,Hydroseed: targeted pollut - CORRECT A N S W E R ⬛⬛- 1) sediment
2) nutrients
3) metals
4) ph


Hydroseed: imp consid - CORRECT ANSWER⬛⬛ - 1) need adequate moisture
2) additional mulch may be added
3) pretreatment where cover is not met
4) apply from multi angles to avoid shadowing


Hydroseed: limitations - CORRECT A N S W E R ⬛⬛- 1) seed mix approp for seasonal
conditions
2) time of application per seasonal conditions
3) difficult on steep slopes
4) no pedestrian or vehicle traffic
5) avoid high winds



Hydroseed: inspect: - CORRECT A N S W E R ⬛⬛- 1) adequate coverage of diet areas
2) signs of pedest or vehicle traffic
3) signs of animal activity
4) check seed mix for correct type and application rate



Hydroseed: Maint - CORRECT ANSWER⬛⬛- 1) reapply in areas needing more cover
2) insure proper moisture
3) maintain unbroken coverage through out project
4) require repair due to traffic or animals


Hydroseed: potentailly assoc bmps - CORRECT A N S W E R ⬛⬛- 1) hydromulch

, 2) seeding
3) mulching
4) temp stabi
5) tackifiers


RCP: descript and purp - CORRECT ANSWER⬛⬛- temp or perm erosion control blankets
that act as soils stabilization devices to protect diet areas from erosions.



RCP: object - CORRECT A N S W E R ⬛⬛- 1) erosion control
2) runoff control
3) post construct


RCP: target pollutants - CORRECT A N S W E R ⬛⬛- 1) sediment



RCP: applications - CORRECT ANSWER⬛⬛- 1) on slopes w/ potential for erosion
2) flow velocity reduction
3) temp channel stab
4) soil/rip-rap seperator
5) soil stabi
6) aid in germination
7) increase soil infiltration
8) stockpile protect



RCP: limitations - CORRECT A N S W E R ⬛⬛- 1) ped and vehic hazard
2) not for use in rocky, established veg will be mowed and high fire
3) blankets dislocated easily
4) uv degradable
5) small animals can be trapped

Document information

Uploaded on
May 12, 2026
Number of pages
129
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EliteStudyHub
2.1
(10)
Sold
84
Followers
6
Items
9359
Last sold
23 hours ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions