Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 12 pages
Exam (elaborations)

ICC GENERAL REQUIREMENTS (GR) EXAM QUESTIONS AND ANSWERS

Document preview thumbnail
Preview 2 out of 12 pages

ICC GENERAL REQUIREMENTS (GR) EXAM QUESTIONS AND ANSWERS

Content preview

ICC GENERAL REQUIREMENTS
(GR) EXAM QUESTIONS AND
ANSWERS 2026 - 2027

All nonconforming items shall be brought to the immediate attention
of the _____ . - ANSWERS-Contractor


SIM 2012 Ch 2 "Nonconforming Items"


What are approved plans? - ANSWERS-Plans submitted by the
permit applicant and approved by governing jurisdiction.


Special inspections are in addition to the _____ performed by the city
inspector and the _____ performed by the Registered Design
Professional. - ANSWERS-Judicial/Municipal inspections , structural
observations


Special inspection reviews the _____ while jurisdictional inspection
reviews _____ . - ANSWERS-fine details , broader details


SIM 2012 Ch 1 "Key Aspects of Special Inspection"


The permit applicant shall submit a "Statement of Special
Inspections" prepared by _____ . - ANSWERS-the Registered Design
Professional

, SIM 2012 Ch 3 "Duties and Responsibilities of the Registered Design
Professional in Responsible Charge"
IBC 1704.2.3 and 1704.3


Who shall the special inspector furnish inspection reports (progress
reports) to? - ANSWERS-The Building Official and Registered
Design Professional


_____ is the full-time observation of work requiring special
inspection. - ANSWERS-Continuous special inspection


SIM 2012 Ch 2 "Periodic and Continuous Special Inspection"


Is special inspection required for concrete placement of continuous
footings, for poured in place walls, if the building is two stories, and
the engineer included the footings in his statement of special
inspections? - ANSWERS-Yes


IBC 1705.3


If it takes 6 1/2 hours and 26 concrete trucks to pour sheer walls on
the third level of a ten-story building, how much time is a special
inspector required to be on site? - ANSWERS-The entire time
(continuous inspection)

Document information

Uploaded on
May 12, 2026
Number of pages
12
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$18.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Teacher101
4.6
(276)
Sold
506
Followers
74
Items
11179
Last sold
13 hours ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions