1. What is the primary purpose of a construction estimate?
A. To set the project schedule
B. To determine the probable cost of a project
C. To hire subcontractors
D. To design the building
Rationale: Estimating focuses on calculating the probable cost to
complete a project accurately.
2. Which of the following is considered a direct cost in construction?
A. Office utilities
B. Marketing expenses
C. Labor and materials for construction
D. Insurance premiums
Rationale: Direct costs are expenses directly attributable to the project,
such as labor and materials.
3. Contingency in an estimate is used to account for:
A. Labor benefits
B. Unforeseen conditions or risks
C. Profit margins
D. Project scheduling
Rationale: Contingency covers potential unknowns that may arise during
construction.
4. What does the term “unit cost” refer to?
A. Total project cost
, B. Cost per unit of work or material
C. Equipment cost
D. Labor overhead
Rationale: Unit cost breaks down costs into per-unit amounts, such as per
cubic yard or square foot.
5. In a conceptual estimate, which of the following is typically used?
A. Detailed takeoff
B. Subcontractor quotes
C. Historical cost data or cost per square foot
D. Material invoices
Rationale: Conceptual estimates are preliminary and rely on historical
data or general parameters.
6. Which method is often used for estimating projects where detailed
drawings are not available?
A. Bottom-up estimating
B. Parametric estimating
C. Square-foot or unit-cost estimating
D. Detailed quantity takeoff
Rationale: Square-foot estimating allows approximate cost evaluation
when detailed information is missing.
7. What is the primary purpose of a bid bond?
A. Guarantee project completion
B. Ensure quality control
C. Guarantee that the contractor will enter into a contract if awarded
D. Cover insurance costs
Rationale: A bid bond protects the owner if the contractor fails to honor
the bid.
8. Which of the following is an indirect cost?
A. Concrete
B. Steel beams
C. Project management salary
D. Labor
, Rationale: Indirect costs are necessary for project completion but not tied
to a specific work item.
9. In construction estimating, what is a "takeoff"?
A. Material delivery
B. Labor schedule
C. Quantification of materials and labor needed for a project
D. Cost of permits
Rationale: A takeoff lists the quantities of each item required for
estimating purposes.
10.Which of the following best defines "overhead"?
A. Costs for subcontractors
B. Direct material costs
C. General business expenses not tied to a specific project
D. Equipment rental fees
Rationale: Overhead covers administrative, office, and corporate costs.
11.A conceptual estimate typically has which level of accuracy?
A. ±1%
B. ±5%
C. ±15–30%
D. ±50%
Rationale: Conceptual estimates are rough approximations with wider
tolerances.
12.What is the primary use of a cost database in estimating?
A. Tracking equipment
B. Referencing historical cost data for accuracy
C. Scheduling labor
D. Hiring subcontractors
Rationale: Cost databases provide reliable historical costs for estimating
similar projects.
13.What is the function of a subcontractor quote in estimating?
A. To finalize schedule
B. To determine specific trade costs
C. To establish profit margins