Term
Dead in main are?
Give this one a try later!
Pallor. Diarrhea.
Headache. Flushing.
Don't know?
2 of 50
Term
Common valve for elevation storage tank?
,Give this one a try later!
Altitude valve. Gauge on hydrant.
ALL THE ABOVE!! Physical air-gap.
Don't know?
3 of 50
Term
how many hours after a sample do you have to take it to a lab?
Give this one a try later!
48hrs 12hrs
30hrs 24hrs
Don't know?
4 of 50
Term
8.0 Lead?
Give this one a try later!
, 0.5 Flex. 0.1 Flex.
0.2 Flex. 0.3 Flex.
Don't know?
5 of 50
Term
Before a new water main is back filled and placed in service, it must
be?
Give this one a try later!
Pressure test, flushed,
Leak test, sanded, polished, and
disinfected, flushed, and
mineral sampling.
bacteria sampling.
Visual inspection, painted, capped, Flow test, cleaned, sealed, and
and sealed. chemical analysis.
Don't know?