Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

Florida Building Contractor Business/Finance Study Exam Updated 2026/2027 Questions with Expert-Verified Answers

Document preview thumbnail
Preview 2 out of 7 pages

This document contains questions and verified answers for Florida Building Contractor Business/Finance Study Exam. It includes detailed explanations, revision-focused content, and exam preparation material suitable for 2026/2027 students.

Content preview

Florida Building Contractor
Business/Finance Study Exam

1. How many personnel ought to an enterprise have before he have to observe for workers
repayment insurance? - ANS-1 or more

2. The maximum vital element to don't forget when bidding is: - ANS-Profit

3. What does the acronym GAAP represent in accounting? - ANS-Generally Accepted
Accounted Principles

four. If I fail one or more portions of the examination, do I ought to retake all components
again? - ANS-No, best the checks on which he or she did not reap a passing score

5. In order to reap a constructing allow the subsequent is needed: - ANS-Filling out an
application

6. When are you able to permit your employee to view their private document? -
ANS-Whenever they desire to

7. A price bond would be published by using the: - ANS-Prime contractor or property
proprietor

eight. How long when I pass the examinations do I have to follow for Initial Licensure? -
ANS-Four years

9. Are contractors required to qualify a construction enterprise? - ANS-Yes

10. A charge bond ensures that the bonding organization pays legitimate claims for unpaid
payments owed by way of the ______ posting the bond. - ANS-Prime contractor or assets
owner

eleven. Before the completion of labor the individual that authorizes a transient certificate of
__________ is the constructing legitimate. - ANS-Occupancy

12. Majority for the negotiated production contracts are on a ________ basis. - ANS-Cost
plus price

thirteen. What ought to a contractor do to prevent cash flow issues on the stop of a
production mission? - ANS-Obtain a line of credit score from a financial institution

14. What need to be completed with the contractors IRS shape W-2? - ANS-File a duplicate
in the contractor's office

, 15. By regulation, your employees won't be more youthful than ______ of age. - ANS-16

sixteen. Business fairness is shown at the monetary statement called teh: - ANS-Balance
Sheet

17. State incapacity and earnings taxes have to be: - ANS-Reported and paid quarterly

18. The best purpose an enterprise can lawfully deny employment is _________. - ANS-No
paintings experience or social safety quantity

19. You are accredited _______ attempts within four years from the date of the preliminary
licensure examination to pass all portions of the examinations. - ANS-Four years

20. The simplest time a contractor does not need to be licensed is that if: - ANS-If you're
running on a minor mission and no longer compensated

21. When is the quality time to let your attorney see your production settlement? - ANS-After
the contract is prepared however earlier than you signal it

22. Is repayment payable if an worker refuses to apply a protection equipment like a hard
hat, safety goggles or take a look at a protection rule? - ANS-Yes, however the blessings can
be decreased by means of 25%

23. One cause why a contractor keeps alternate order on report is: - ANS-By regulation

24. Which shape authorizes a contractor to proceed with paintings until a formal alternate
order may be processed? - ANS-Field Order

25. Under the Worker's Compensation Drug-Free Workplace Program, can a Contractor
conduct random drug trying out of his/her personnel? - ANS-The regulation does no longer
restrict a personal organisation from accomplishing random testing or every other lawful
testing of employees

26. A permit is required from OSHA for trenches which can be ______ or more in depth. -
ANS-5 toes

27. In a fee-incentive settlement, the most commonplace percentage of savings provided to
a contractor is _______ percentage? - ANS-50%

28. What if an worker refuses to take a drug check? - ANS-The corporation is permitted to
discharge or area the employee or may refuse to hire the applicant

29. The Federal agency that problems an Employer Identification Number is: - ANS-IRS

30. In creation contracts, extensions of time are formalized by means of a report called: -
ANS-Change order

Document information

Uploaded on
May 5, 2026
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Tutor96
3.8
(35)
Sold
195
Followers
31
Items
2796
Last sold
3 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions