Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 70 pages
Exam (elaborations)

SMARTSHEET PROJECT MANAGEMENT CERTIFICATION 2026 COMPREHENSIVE REVIEW AND TESTED CONCEPTS

Document preview thumbnail
Preview 4 out of 70 pages

SMARTSHEET PROJECT MANAGEMENT CERTIFICATION 2026 COMPREHENSIVE REVIEW AND TESTED CONCEPTS

Content preview

SMARTSHEET PROJECT MANAGEMENT
CERTIFICATION 2026 COMPREHENSIVE
REVIEW AND TESTED CONCEPTS

◉ Planned Value (PV). Answer: The portion of the approved total
cost estimate planned to be spent on an activity during a given
period. Planned % Complete x BAC


◉ Actual Cost (AC). Answer: The realized cost incurred for the work
performed on an activity during a specific time period.


◉ Budget at Completion (BAC). Answer: The sum of all budgets
established for the work to be performed.


◉ Estimate to Complete (ETC). Answer: The expected cost to finish
all the remaining project work. EAC - AC


◉ Estimate at Completion (EAC). Answer: The expected total cost of
completing all work expressed as the sum of the actual cost to date
and the estimate to complete. BAC / CPI

,◉ Cost Performance Index (CPI). Answer: A measure of the cost
efficiency of budgeted resources expressed as the ratio of earned
value to actual cost. EV / AC


◉ Schedule Performance Index (SPI). Answer: A measure of
schedule efficiency expressed as the ratio of earned value to planned
value. EV / PV


◉ To-Complete Performance Index (TCPI). Answer: A measure of the
cost performance that is required to be achieved with the remaining
resources in order to meet a specified management goal, expressed
as the ratio of the cost to finish the outstanding work to the
remaining budget. (BAC - EV) / (BAC - AC)


◉ Cost Variance (CV). Answer: EV - AC
Negative is over budget; positive is under budget


◉ Schedule Variance (SV). Answer: EV - PV
Negative is behind schedule; positive is ahead of schedule


◉ Variance at Completion (VAC). Answer: A projection of the amount
of budget deficit or surplus, expressed as the difference between the
budget at completion and the estimate at completion. BAC - EAC

,◉ Economic Value Added (EVA). Answer: Net operating profit after
taxes minus (capital x cost of capital); a measure of the economic
value of an investment or project


◉ Future Value (FV). Answer: the value of future cash flows
discounted at the appropriate discount rate FV = PV(1+r)^n


◉ Return on Invested Capital (ROIC). Answer: Net income after tax /
Invested Tax (smaller is better)


◉ Order of Magnitude Estimate. Answer: A high-level estimate of the
time and cost of a project based on the actual cost and duration of a
similar project. -50% to +100%


◉ Conceptual Estimate. Answer: a cost estimate based on very little
design information and using gross unit pricing to determine the
project cost. -30% to +50%


◉ Preliminary Estimate. Answer: -20% to +30% estimate range


◉ Definitive Estimate. Answer: -15% to +20% estimate range


◉ Control Estimate. Answer: -10% to +15% estimate range

, ◉ Delphi Technique. Answer: A decision-making technique in which
group members do not meet face-to-face but respond in writing to
questions posed by the group leader. Prevents biasing opinions and
groupthink.


◉ Nominal Group Technique. Answer: Brainstormed ideas are voted
upon and sorted by priority


◉ Scope Baseline. Answer: The approved version of a scope
statement, work breakdown structure (WBS), and its associated
WBS dictionary, that can be changed only through formal change
control procedures and is used as a basis for comparison.


◉ Baseline. Answer: The original plan plus all approved changes
(scope, schedule, cost)


◉ Functional Organization. Answer: Departmentalization around
specialized activities such as production, marketing, and human
resources.


◉ Projectized Organization. Answer: Any organizational structure in
which the project manager has full authority to assign priorities,
apply resources, and direct the work of persons assigned to the
project.

Document information

Uploaded on
May 5, 2026
Number of pages
70
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
FocusFile7
3.8
(22)
Sold
216
Followers
3
Items
54846
Last sold
1 day ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions