Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 36 pages
Exam (elaborations)

AAAE CM MODULE 4 EXAMINATION TEST 2026 COMPREHENSIVE QUESTIONS AND SOLUTIONS CERTIFICATION EVALUATION PRACTICE SOLUTION GRADED A+

Document preview thumbnail
Preview 4 out of 36 pages

AAAE CM MODULE 4 EXAMINATION TEST 2026 COMPREHENSIVE QUESTIONS AND SOLUTIONS CERTIFICATION EVALUATION PRACTICE SOLUTION GRADED A+

Content preview

AAAE CM MODULE 4 EXAMINATION TEST
2026 COMPREHENSIVE QUESTIONS AND
SOLUTIONS CERTIFICATION EVALUATION
PRACTICE SOLUTION GRADED A+

⩥ The FAA recommends these types of meetings for Airport Master Plan
updates. Answer: Open House


⩥ What is the focus of Airport Master Plan (AMP) Prudent Planning
Criteria? Answer: Focus on minimizing minimize unavoidable
environmental impact and to avoid delays in project design and
construction


⩥ What are the five factors that affect Demand Forecasting? Answer: "1)
Economic Characteristics
2) Demographic Characteristics
3) Geographical Attributes
4) Aviation Related Factors, Other Factors "


⩥ What are the four types of Forecast Methods? Answer: "1) Regression
Analysis - Ties aviation demand to enplanements, population and
income levels
2) Trend Analysis and Extrapolation - Historical pattern of aviation
activity to project future trends

,3) Market Shares Analysis -top-down relationship among national,
regional, state, and local forecasts, where local forecasts represent a
market share or percentage of national forecasts.
4) Smoothing - historical data focused more on the recent trends and
conditions of the airport"


⩥ List 8 key activities of the Facilities Implementation Plan. Answer: "1.
Sponsor-specific project approval activities
2. Airline and other tenant approvals including lease modifications
3. Project funding activities (FAA grants, PFC, and long-term debt
financing)
4. Environmental processing activities
5. Land acquisition activities
6. Sponsor-specific project implementation, process activities associated
with the design and build of the projects
7. Agency coordination activities
8. Public coordination activities"


⩥ What portion of the AMP shows how the airport will fund
recommended projects? Answer: Financial Feasibility Analysis


⩥ Additional pavement in the form of fillets are designed to maintain the
___ ___ ___ ___ (___). Answer: Taxiway Edge Safety Margin (TESM).

,⩥ What factors determine the substantial use of the Airport's Design
Aircraft? Answer: "Largest scheduled commercial service aircraft
500 or more annual itinerant operations
If AO and FAA foresee future vision of change of fleet mixture"


⩥ What are the 4 runway configurations? Answer: "(1) single
(2) open-V
(3) parallel
(4) intersecting"


⩥ What are the three reasons a runway may have a displaced threshold?
Answer: "(1)an object obstructs the airspace needed for landing aircraft,
(2) for environmental considerations such as noise abatement, or
(3) if necessary to provide standard runway safety area dimensions or
runway obstacle free zone lengths."


⩥ Nose gear steering angle is no more than ___ degrees, the generally
accepted value to prevent excessive tire scrubbing. Answer: 50 degrees


⩥ When must an airport issue a change order to a contract? Answer:
When the change exceeds an increase or decrease of 25% of the
estimated cost.

, ⩥ Basic operational and services data of the airport are maintained
where? Answer: Airport Master Record 5010


⩥ The principal imaginary surfaces defined in FAR Part 77 are: Answer:
"1) Primary Surfaces
2) Transitional Surfaces
3) Approach Surfaces
4) Horizontal Surfaces
5) Conical Surfaces"


⩥ The Airport Terminal should provide what? Answer: Safe, efficient,
comfortable transfer of passengers and baggage


⩥ Airport terminal facilities are planned on the basis of activity
forecasts. The annual forecast normally used are__________,
_________, and __________ Answer: "Passenger enplanements
passenger originations
and aircraft movements (by aircraft size)"


⩥ How do terminal planners forecast activities? Answer: "1) Current
airport Master Plan,
2) FAA published terminal area forecasts,
3) Forecasts developed by Airlines for America (A4A)

Document information

Uploaded on
May 4, 2026
Number of pages
36
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GradeGalaxy
4.4
(9)
Sold
139
Followers
4
Items
47158
Last sold
2 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions