Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 32 pages
Exam (elaborations)

TCEQ OSSF Exam

Document preview thumbnail
Preview 4 out of 32 pages

Pass the TCEQ OSSF certification exam. 80 updated practice questions with answers and explanations covering Installer II, Designated Representative, Site Evaluator, Maintenance Provider, soil evaluation, permitting, and enforcement.

Content preview

TCEQ OSSF Exam 2026-2027 | 80 Practice
Questions & Answers | Installer II,
Designated Representative, Site Evaluator
Test Prep

Description:
Pass the 2026-2027 TCEQ OSSF certification exam. 80 updated practice questions with
answers and explanations covering Installer II, Designated Representative, Site
Evaluator, Maintenance Provider, soil evaluation, permitting, and enforcement.




Download the complete study guide now and ace your exam on the first attempt.

, TCEQ OSSF Exam 2026-2027
Subject: On-Site Sewage Facility (OSSF) Regulations and Professional Practices
Jurisdiction: Texas Commission on Environmental Quality (TCEQ)
Target Audience: OSSF Installers, Designated Representatives, Site Evaluators, and
Maintenance Providers


Section 1: Regulatory Framework and Historical Context

Question 1
The Texas Commission on Environmental Quality (TCEQ) initially adopted the current On-
Site Sewage Facility (OSSF) rules in which year, followed by multiple subsequent revisions?

A. 1987
B. 1997
C. 2005
D. 2015

Answer: B

Explanation: The TCEQ adopted the current OSSF rules in 1997 and has revised them
several times since to align with evolving environmental and public health standards.


Section 2: Roles and Responsibilities

Question 2
Which licensed professional is authorized to review permit applications, conduct site
evaluations, examine planning materials, and perform inspections of OSSFs?

A. Installer
B. Site Evaluator
C. Designated Representative
D. Maintenance Provider

Answer: C

,Explanation: The Designated Representative holds the authority to review permit
applications, evaluate sites, assess planning documents, and inspect OSSFs on behalf of the
permitting authority.

Question 3
An individual who holds a valid TCEQ license and is compensated by another party to
construct, install, alter, or repair an OSSF is defined as a(n):

A. Site Evaluator
B. Designated Representative
C. Installer
D. Professional Engineer

Answer: C

Explanation: Under TCEQ rules, an Installer is a licensed individual who performs
construction, installation, alteration, or repair of an OSSF for compensation.

Question 4
Which professional is responsible for visiting a property to conduct soil evaluations and a site
survey?

A. Installer
B. Designated Representative
C. Maintenance Provider
D. Site Evaluator

Answer: D

Explanation: The Site Evaluator performs on-site soil assessments and surveys to determine
suitability for an OSSF.

Question 5
Within the jurisdiction of the permitting authority, the Designated Representative is
prohibited from performing which of the following compensated activities?

A. Serving as a public health consultant
B. Working as an Installer, Designer for a fee, or private Site Evaluator

, C. Conducting soil texture analyses
D. Reviewing as-built drawings

Answer: B

Explanation: To avoid conflicts of interest, the Designated Representative cannot act as an
Installer, paid Designer, or private Site Evaluator within their permitting authority’s
jurisdiction.


Section 3: Licenses Requiring Prior Experience

Question 6
Which OSSF license types require documented previous experience according to TCEQ
rules? (Select all that apply)

A. Installer I
B. Installer II
C. Maintenance Provider
D. Site Evaluator (without experience in soil science)

Answer: B and C

Explanation: Installer II and Maintenance Provider licenses require prior field experience,
whereas Installer I and entry-level Site Evaluator roles may have different prerequisites.


Section 4: Engineering and Design Requirements

Question 7
Planning materials for an OSSF that utilizes secondary treatment must be prepared by a:

A. Licensed Site Evaluator
B. Designated Representative
C. Professional Engineer (PE) or Registered Sanitarian (RS)
D. Maintenance Provider II

Answer: C

Document information

Uploaded on
May 2, 2026
Number of pages
32
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$22.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Paulacademia1
4.3
(6)
Sold
36
Followers
3
Items
2254
Last sold
1 hour ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions