Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

2026 WGU C215 Study Guide - FINAL EXAM (updated 2026) Questions & Answers | With 100% Correct Answers graded A+ Guaranteed Success!!

Rating
-
Sold
-
Pages
19
Grade
A+
Uploaded on
02-05-2026
Written in
2025/2026

2026 WGU C215 Study Guide - FINAL EXAM (updated 2026) Questions & Answers | With 100% Correct Answers graded A+ Guaranteed Success!!

Institution
Vati Rn Comprehensive. Predictor
Course
Vati Rn comprehensive. Predictor

Content preview

2026 WGU C215 Study Guide - FINAL
EXAM (updated 2026) Questions &
Answers | With 100% Correct Answers
graded A+ Guaranteed Success!!




Total Quality Management (TQM) Philosophy -Answer--1. customer focus
2. continuous improvement
3. employee empowerment
4. use of quality tools
5. product design
6. process management
7. managing supplier quality

Process Capability Index (Cpk) -Answer--Basic function of Six Sigma. Measures the
process potential and performance of processes. The higher the range of Cpk, the
improved is the ability of the process to complete its necessities.

Six Sigma -Answer--A disciplined, data-driven approach and methodology for
eliminating defects (driving toward six standard deviations between the mean and
the nearest specification limit) in any process - from manufacturing to transactional
and from product to service.

Design Capacity -Answer--The theoretical maximum output of a system in a given
period under ideal conditions.

Location Analysis -Answer--proximity to customers, transportation, source of labor,
community attitude, proximity to suppliers, and many other factors.

The technique for determining location decisions.

Line Processes -Answer--A type of process used to produce a large volume of a
standardized product.

■ Limited customization and high volume

,Batch Processes -Answer--A type of process used to produce a small number of
products in groups or batches based on customer orders or specifications.

■ High customization moderate volume

Project Processes -Answer--A type of process used to make a one-at-a-time product
exactly to customer specifications.

■ Most custom and lowest volume

Continuous Processes -Answer--A type of process that operates continually to
produce a high volume of a fully standardized product.

- No customization and as high a volume as possible

Bottleneck -Answer--Longest task in the process.

Flexible Manufacturing System (FMS) -Answer--A type of automated system that
combines the flexibility of intermittent operations with the efficiency of continuous
operations.

Output/Input Control -Answer--A technique for monitoring the flow of jobs between
work centers.

Value-Added -Answer--The net increase created during the transformation of inputs
into final outputs.

Hybrid Layouts -Answer--Layouts that combine characteristics of process and
product layouts.

- Group technology layouts.
- Cell technology layouts.
- Grocery stores use hybrid layouts

Relationship Chart (REL) -Answer--Table that reflects opinions of managers with
regard to the importance of having any two departments close together.

Rectilinear Distance -Answer--The shortest distance between two locations using
north-south and east-west movements.

From-To Matrix -Answer--Table that gives the number of trips or units of product
moved between any pair of departments.

, Block Plan -Answer--Schematic showing the placement of resources in a facility.

Mean Observed Times -Answer--The average of the observation times for each of
the work elements.

Normal Time -Answer--The mean observed time multiplied by the performance rating
factor by the frequency of occurrence.

Standard Time -Answer--The length of time it should take a qualified worker using
appropriate process and tools to complete a specific job, allowing time for personal
fatigue and unavoidable delays.

Just-in-Time (JIT) -Answer--A philosophy designed to achieve high-volume
production through elimination of waste and continuous improvement. Based on a
"pull" system rather than a "push" system. The three elements are just-in-time
manufacturing, total quality management, and respect for people.

Kanban card -Answer--A card that specifies the exact quantity of product that needs
to be produced.

Tier One Suppliers -Answer--Supplies materials or services directly to the processing
facility.

These are the suppliers that put products in specific containers or packages.

Internal Functions companies

Tier Two Suppliers -Answer--Directly supplies materials or services to a tier-one
supplier in the supply chain.

Suppliers of the specialty materials for the tier one suppliers to be able to produce
the packaging necessary for different products.

Think cardboard, plastic, glass, chemicals.

Tier Three Suppliers -Answer--Directly supplies materials or services to a tier two
supplier in the supply chain.

These are companies that extract raw materials.

Oil, raw chemical materials, wood.

Capacity Requirements Planning (CRP) -Answer--Determines the labor and machine
resources needed to fill the open and planned orders generated by the MRP.

Written for

Institution
Vati Rn comprehensive. Predictor
Course
Vati Rn comprehensive. Predictor

Document information

Uploaded on
May 2, 2026
Number of pages
19
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$17.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
ngatiaderrick7

Get to know the seller

Seller avatar
ngatiaderrick7 Chamberlain College Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
-
Member since
2 year
Number of followers
0
Documents
270
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions