●● Select all listed documentation CORs will maintain in their COR file
throughout the life of a contract..
Answer: A) Correspondences with the contractor and KO.
B) When assigned, evidence that the 450 OGE is completed annually.
C) Evidence CPARs input has been verified on service contracts.
D) Contract deliverables.
●● Completed COR status reports (CSR), Surveillance Schedules, and
Checklists must be uploaded to the Surveillance and Performance
Monitoring (SPM) by the 30th of each month..
Answer: False
●● The QASP:.
Answer: B) Will include a completed schedule and checklist.
C) Is prepared in conjunction with the Statement of Work (SOW)
●● Match the question with the correct response option below:.
Answer: Who nominates a COR? = RA
, Who assigns and authorizes COR responsibilities? = KO
What is COR implied authority based upon? = Appointment Letter
●● After the end of the Evaluation Period, within how many days are all
CPARS inputs due?.
Answer: 120
●● Supporting surveillance documentation is not required before
acceptance or approval of products/supplies..
Answer: True
●● The Quality Assurance Specialists support the KO in assessing,
determining, and documenting contractor and COR performance and
contract administration?.
Answer: True
●● CORs have implied authority to make commitments or changes that
will affect price, quality, quantity, delivery, or any other term or
conditions of the contract?.
Answer: False
●● Which of the following contractor requests should the COR involve
the KO?.
Answer: A) Request for changes in period of performance.
EXAMINATION TEST 2026 QUESTIONS AND
ANSWERS FULLY SOLVED
●● Select all listed documentation CORs will maintain in their COR file
throughout the life of a contract..
Answer: A) Correspondences with the contractor and KO.
B) When assigned, evidence that the 450 OGE is completed annually.
C) Evidence CPARs input has been verified on service contracts.
D) Contract deliverables.
●● Completed COR status reports (CSR), Surveillance Schedules, and
Checklists must be uploaded to the Surveillance and Performance
Monitoring (SPM) by the 30th of each month..
Answer: False
●● The QASP:.
Answer: B) Will include a completed schedule and checklist.
C) Is prepared in conjunction with the Statement of Work (SOW)
●● Match the question with the correct response option below:.
Answer: Who nominates a COR? = RA
, Who assigns and authorizes COR responsibilities? = KO
What is COR implied authority based upon? = Appointment Letter
●● After the end of the Evaluation Period, within how many days are all
CPARS inputs due?.
Answer: 120
●● Supporting surveillance documentation is not required before
acceptance or approval of products/supplies..
Answer: True
●● The Quality Assurance Specialists support the KO in assessing,
determining, and documenting contractor and COR performance and
contract administration?.
Answer: True
●● CORs have implied authority to make commitments or changes that
will affect price, quality, quantity, delivery, or any other term or
conditions of the contract?.
Answer: False
●● Which of the following contractor requests should the COR involve
the KO?.
Answer: A) Request for changes in period of performance.