G202 PRACTICE EXAMINATION 2026 QUESTIONS WITH
ANSWERS GRADED A+
● Abatement. Answer: Removal of hazardous materials before demolition
● Salvage. Answer: Recovery of materials for reuse
● Recycling. Answer: Processing materials for new use
● Construction Waste Management. Answer: Controlling and reducing job site waste
● Waste Diversion. Answer: Keeping materials from landfills
● Dumpster. Answer: Container for construction debris
● Sorting. Answer: Separating waste materials by type
● Material Tracking. Answer: Documenting quantities of waste
● Landfill. Answer: Disposal site for solid waste
● Recycling Facility. Answer: Location processing recyclable materials
● Hazardous Waste Disposal. Answer: Proper elimination of dangerous materials
● Universal Waste. Answer: Common hazardous items with simplified handling
● E-Waste. Answer: Electronic equipment requiring special disposal
● Construction Debris. Answer: Waste materials from building projects
● Clean Fill. Answer: Uncontaminated soil suitable for fill material
● Contaminated Soil. Answer: Earth with hazardous substances
● Soil Testing. Answer: Analysis of earth for contaminants
● Geotechnical Report. Answer: Analysis of soil conditions affecting construction
● Soil Bearing Capacity. Answer: Ability of earth to support load
, ● Foundation Design. Answer: Engineering of building support system
● Spread Footing. Answer: Concrete pad distributing load to soil
● Deep Foundation. Answer: Support system extending to stable soil layer
● Pile Foundation. Answer: Driven or drilled shafts supporting structure
● Caisson. Answer: Large diameter deep foundation element
● Grade Beam. Answer: Reinforced concrete beam at ground level
● Slab-on-Grade. Answer: Concrete floor placed directly on ground
● Vapor Barrier. Answer: Membrane preventing moisture migration
● Subgrade. Answer: Prepared earth surface below slab or paving
● Compaction. Answer: Densifying soil to increase strength
● Backfill. Answer: Material placed in excavation after construction
● Engineered Fill. Answer: Specified material placed and compacted per requirements
● Select Fill. Answer: Quality material chosen for specific properties
● Native Soil. Answer: Original earth at site
● Topsoil. Answer: Upper fertile soil layer
● Subsoil. Answer: Soil layer below topsoil
● Bedrock. Answer: Solid rock beneath soil layers
● Groundwater. Answer: Water naturally occurring underground
● Water Table. Answer: Upper surface of groundwater
● Dewatering. Answer: Removing water from excavation
● Well Point. Answer: Device pumping groundwater from construction area
● Sump Pump. Answer: Device removing water from low point
● Drainage System. Answer: Network controlling water movement
ANSWERS GRADED A+
● Abatement. Answer: Removal of hazardous materials before demolition
● Salvage. Answer: Recovery of materials for reuse
● Recycling. Answer: Processing materials for new use
● Construction Waste Management. Answer: Controlling and reducing job site waste
● Waste Diversion. Answer: Keeping materials from landfills
● Dumpster. Answer: Container for construction debris
● Sorting. Answer: Separating waste materials by type
● Material Tracking. Answer: Documenting quantities of waste
● Landfill. Answer: Disposal site for solid waste
● Recycling Facility. Answer: Location processing recyclable materials
● Hazardous Waste Disposal. Answer: Proper elimination of dangerous materials
● Universal Waste. Answer: Common hazardous items with simplified handling
● E-Waste. Answer: Electronic equipment requiring special disposal
● Construction Debris. Answer: Waste materials from building projects
● Clean Fill. Answer: Uncontaminated soil suitable for fill material
● Contaminated Soil. Answer: Earth with hazardous substances
● Soil Testing. Answer: Analysis of earth for contaminants
● Geotechnical Report. Answer: Analysis of soil conditions affecting construction
● Soil Bearing Capacity. Answer: Ability of earth to support load
, ● Foundation Design. Answer: Engineering of building support system
● Spread Footing. Answer: Concrete pad distributing load to soil
● Deep Foundation. Answer: Support system extending to stable soil layer
● Pile Foundation. Answer: Driven or drilled shafts supporting structure
● Caisson. Answer: Large diameter deep foundation element
● Grade Beam. Answer: Reinforced concrete beam at ground level
● Slab-on-Grade. Answer: Concrete floor placed directly on ground
● Vapor Barrier. Answer: Membrane preventing moisture migration
● Subgrade. Answer: Prepared earth surface below slab or paving
● Compaction. Answer: Densifying soil to increase strength
● Backfill. Answer: Material placed in excavation after construction
● Engineered Fill. Answer: Specified material placed and compacted per requirements
● Select Fill. Answer: Quality material chosen for specific properties
● Native Soil. Answer: Original earth at site
● Topsoil. Answer: Upper fertile soil layer
● Subsoil. Answer: Soil layer below topsoil
● Bedrock. Answer: Solid rock beneath soil layers
● Groundwater. Answer: Water naturally occurring underground
● Water Table. Answer: Upper surface of groundwater
● Dewatering. Answer: Removing water from excavation
● Well Point. Answer: Device pumping groundwater from construction area
● Sump Pump. Answer: Device removing water from low point
● Drainage System. Answer: Network controlling water movement