Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 27 pages
Exam (elaborations)

CEM FINAL EXAM Question and answers rated A+ 2025/2026

Document preview thumbnail
Preview 3 out of 27 pages

CEM FINAL EXAM Question and answers rated A+ 2025/2026

Content preview

CEM FINAL EXAM Question and answers
rated A+ 2025/2026
Phases in a Project Cycle -CORRECTANSWER Need, Programming, Schematic

Design, Detailed Design, Construction Documents, Bid, Construction, Operation &

Maintenance, Decommission



Sectors of the Construction Industry -CORRECTANSWER Industrial, Heavy civil,

Building, Residential



Industrial Construction -CORRECTANSWER 5-10% ex: gasoline



Heavy Construction -CORRECTANSWER 20-25% ex: roads, I-85



Building Construction -CORRECTANSWER 35-40% ex: hospitals, schools



Residential Construction -CORRECTANSWER 30-30% ex: apartment, house, farm



Major Players in Construction -CORRECTANSWER Owners & Developers, Designers,

Builders, Consultants



Construction Management -CORRECTANSWER Money, Materials, Machines and

Manpower

,LEED -CORRECTANSWER Leadership in Energy & Environmental Design.

Principles: Choose a sustainable site, maximize water efficiency, save energy, make

smart material & resource decisions and improve indoor air quality.



Level of Influence vs Cost Curves -CORRECTANSWER Influence of cost is greater at

the beginning of the construction process and decreases over time while cost increases

over time.



What happened in the Hyatt collapse? -CORRECTANSWER Under-designed Box-

Beam did not meet building codes, constructability changes did not account for design

intent and doubled load on an under-designed box-beam, poor

coordination/communication



Types of Estimating -CORRECTANSWER AACE, RS Means, Bid Estimates, Control

Estimates, and Halpin's et al.



AACE estimate -CORRECTANSWER Order of Magnitude: -30% to +50%

Budget: -15% to +30%

Definitive: -5% to 15%



RS Means Estimate -CORRECTANSWER Order of Magnitude: +-20%

Square Foot & Cubic Foot: +-15%

, System: +-10%

Unit Price: +-5%



Bid Estimates -CORRECTANSWER Subcontractor quotations, Quantity takeoffs and

construction procedures



Control Estimates -CORRECTANSWER a non-binding estimate of construction costs

which can be used not only to satisfy the Owner's need for requisitioning funds, but also

as a control over the builder during trade procurement.



Halpin's et al. -CORRECTANSWER conceptual estimate, preliminary estimate,

engineer's estimate and bid estimate; accuracy increases with each step.



Information available vs accuracy of bid -CORRECTANSWER as information increases

accuracy increases



BCI -CORRECTANSWER Building Cost Index: takes into account skilled labor



CCI -CORRECTANSWER Construction Cost Index: takes into account common labor



Programming Phase -CORRECTANSWER Defines the owner's new construction

needs, forms the basis for the owner's expectations, the primary design reference for

the development of the project. Program report is developed.

Document information

Uploaded on
April 21, 2026
Number of pages
27
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Smartpages
4.7
(6)
Sold
52
Followers
0
Items
1475
Last sold
3 weeks ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions